1650 Hutchinson River Parkway East,Bronx, NY 10461

40 Units

Built in 1966

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
248 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 62 violations which is 1.55 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
19Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
24Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
19Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jan 10, 2024§ 27-2005 hmc: properly repair or replace the broken or defective entrance door to closet at east in the private hallway located at apt 1d, 1st story, 1st apartment from west at northNov sent out
Jul 27, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tile floor (uneven, missing) in the bathroom located at apt 5a, 5th story, 1st apartment from east at southNov sent out
Jul 27, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tile (missing) at east east wall in the bathroom located at apt 5a, 5th story, 1st apartment from east at southNov sent out
May 24, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5a, 5th story, 1st apartment from east at southInvalid certification
Jan 08, 2023Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1d, 1st story, 1st apartment from west at northNov sent out
Jan 08, 2023Section 27-2005 adm code properly repair the broken or defective 1st electrical outlet from west at north wall in the 2nd room from north located at apt 1d, 1st story, 1st apartment from west at northNov sent out
Jan 08, 2023Section 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1d, 1st story, 1st apartment from west at northNov sent out
Sep 16, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all. walls in the bathroom located at apt 2a, 2nd story, 1st apartment from east at southFirst no access to re- inspect violation
Sep 01, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1d, 1st story, 1st apartment from west at northNot complied with
Jul 02, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the mold & mildew at ceramic tile walls thru-out in the bathroom located at apt la, 1st story, 1st apartment from east at southNot complied with
May 06, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color west wall and ceiling in the 2nd room from north located at apt 1d, 1st story, 1st apartment from west at northNot complied with
Aug 08, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and walls in the bathroom located at apt 1d, 1st story, 1st apartment from west at northNot complied with
Aug 08, 2018Section 27-2005 adm code paint metal in accordance with dept. regulation at heat riser in the bathroom located at apt 1d, 1st story, 1st apartment from west at northNot complied with
Jul 29, 2017Section 27-2005 adm code paint metal in accordance with dept. regulation steam riser in the bathroom located at apt 1d, 1st story, 1st apartment from north at eastNot complied with
Jul 29, 2017Section 27-2005 adm code replace with new the broken or defective medicine cabinet at wash basin in the bathroom located at apt 1d, 1st story, 1st apartment from north at eastNot complied with
Jul 03, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings, and walls. in the entire apartment located at apt 2a, 3rd story, 1st apartment from east at southFirst no access to re- inspect violation
Jul 03, 2014Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... at ceiling. in the 3rd room from north at east located at apt 2a, 3rd story, 1st apartment from east at southFirst no access to re- inspect violation
May 12, 2014Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling (near to light fixture) in the 3rd room from north at east located at apt 2a, 2nd story, 1st apartment from east at southFirst no access to re- inspect violation
Apr 22, 2014Section 27-2005 adm code refit doors at closet in the 3rd room from east at north located at apt 1d, 1st story, 1st apartment from west at northNot complied with

Property Owners and Associates

Amanda Jankovic
Site Manager, Agent
0(0)

1 Property

40 Units

Logan Llc.
Owner, Corporate Owner
0(0)

2 Properties

43 Units

Rok Rlty Corp
Owner, Corporate Owner
0(0)

2 Properties

43 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet