780 Pelham Parkway South,Bronx, NY 10462

85 Units

Built in 1929

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
404 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 146 violations which is 1.71 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
38Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
72Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
36Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all trims and doors throughout in the entire apartment located at apt f10, 6th story, 2nd apartment from north at east , section ''south''Nov sent out
Feb 26, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt b7, 2nd story, 2nd apartment from north at east , section ''center''Civ14 mailed
Feb 26, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt b7, 2nd story, 2nd apartment from north at east , section ''center''Civ14 mailed
Feb 26, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt b7, 2nd story, 2nd apartment from north at east , section ''center''Civ14 mailed
Feb 26, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt b7, 2nd story, 2nd apartment from north at east , section ''center''Civ14 mailed
Feb 26, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the foyer located at apt f10, 6th story, 3rd apartment from north at east , section at southCiv14 mailed
Feb 26, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 2nd window frame from east at south wall in the 3rd room from east located at apt f10, 6th story, 3rd apartment from north at east , section at southCiv14 mailed
Feb 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north at east located at apt f15, 6th story, 2nd apartment from west at north , section ''center''Nov sent out
Feb 01, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the private hallway located at apt a4, 1st story, 1st apartment from west at north , section at northCiv14 mailed
Jan 04, 2024§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt a4, 1st story, 1st apartment from west at northNov sent out
Oct 20, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt f15, 6th story, 2nd apartment from south at west , section ''center''Nov sent out
Oct 14, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt f15, 6th story, 2nd apartment from south at westNov sent out
Aug 04, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the foyer located at apt f6, 6th story, 1st apartment from north at east , section ''north''Nov sent out
Aug 04, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt f6, 6th story, 1st apartment from north at east , section ''north''Nov sent out
Aug 04, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the private hallway located at apt f6, 6th story, 1st apartment from north at east , section ''north''Nov sent out
Apr 25, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation heating riser at bathroom in the bathroom located at apt a4, 1st story, 1st apartment from west at northNot complied with
Sep 02, 2022§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt a4, 4th story, 1st apartment from west at northNot complied with
Sep 02, 2022§ 27-2005 adm code replace with new the broken or defective wood cabinet under sink in the kitchen located at apt a4, 4th story, 1st apartment from west at northNot complied with
May 24, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st window frame from west at north wall in the 5th room from east at north located at apt a4, 1st story, 1st apartment from west at northNot complied with
May 24, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 2nd window frame from west at north wall in the 5th room from east at north located at apt a4, 1st story, 1st apartment from west at northNot complied with
May 24, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st window frame from south at west wall in the 5th room from east at north located at apt a4, 1st story, 1st apartment from west at northNot complied with
May 24, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door frame from north at east wall in the 5th room from east at south located at apt a4, 1st story, 1st apartment from west at northNot complied with
May 24, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st window frame from south at west wall in the 5th room from east at south located at apt a4, 1st story, 1st apartment from west at northNot complied with
May 24, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 2nd window frame from south at west wall in the 5th room from east at south located at apt a4, 1st story, 1st apartment from west at northNot complied with
Apr 25, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt a4, 1st story, 1st apartment from west at northNot complied with
Apr 25, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt a4, 1st story, 1st apartment from west at northNot complied with
Apr 25, 2022§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from south at west wall in the 5th room from east at north located at apt a4, 1st story, 1st apartment from west at northNot complied with
Nov 08, 2021§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt a4, 1st story, 1st apartment from west at northNot complied with
Sep 27, 2021Section 27-2013 adm code no decorating in 3 years. paint with light colored paint to the satisfaction of this department at east wall, ceiling in the foyer located at apt f2, 6th story, 5th apartment from south at westFirst no access to re- inspect violation
Sep 27, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall, 1st door from north at east wall in the 1st room from north located at apt f2, 6th story, 5th apartment from south at westFirst no access to re- inspect violation
Sep 27, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at 2nd wall cabinet from north at east wall in the kitchen located at apt f2, 6th story, 5th apartment from south at westFirst no access to re- inspect violation
Sep 27, 2021Section 27-2005 adm code paint metal in accordance with dept. regulation at 2nd door from north at east wall, 2nd door frame from north at east wall, 1st door frame from north at east wall in the foyer located at apt f2, 6th story, 5th apartment from south at westFirst no access to re- inspect violation
Sep 27, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway , the 4th room from north located at apt f2, 6th story, 5th apartment from south at westFirst no access to re- inspect violation
Sep 27, 2021Section 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from north at east wall in the kitchen located at apt f2, 6th story, 5th apartment from south at westFirst no access to re- inspect violation
Sep 27, 2021Section 27-2005 adm code paint metal in accordance with dept. regulation at 2nd closet from west at north wall door frame, 1st radiator from east at south wall, 1st window frame from east at south wall in the 1st room from north located at apt f2, 6th story, 5th apartment from south at westFirst no access to re- inspect violation
Sep 27, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at baseboard at west wall in the foyer located at apt f2, 6th story, 5th apartment from south at westFirst no access to re- inspect violation
Sep 17, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt c6, 3rd story, 1st apartment from north at eastNot complied with
Sep 17, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt c6, 3rd story, 1st apartment from north at eastNot complied with

Property Owners and Associates

780 Pp LLC
Owner
3.4(1)

1 Property

85 Units

780 Pp, LLC C/o New Park
Agent, Corporate Owner
3.2(2)

2 Properties

151 Units

Allison Anderson
Officer
3(71)

45 Properties

2897 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Great Super, Horrible management
Former Tenant
Pros:
The building was kept relatively (c) openigloo ...
Cons:
Management constantly changes and are (c) openi...
Advice to owner:
Please reflect on how you've chosen management ...