Apr 17, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jan 06, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak over ceiling at closet in the 1st room from east at north located at apt 310, 3rd story, 2nd apartment from west at northCiv14 mailed
Jan 06, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 8 sq. ft. at ceiling in the bathroom located at apt 310, 3rd story, 2nd apartment from west at northNotice of issuance sent to tenant
Jan 06, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak behind north wall in the 1st room from east at north located at apt 310, 3rd story, 2nd apartment from west at northCiv14 mailed
Jan 06, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at north located at apt 310, 3rd story, 2nd apartment from west at northCiv14 mailed
Jan 06, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at closet in the 1st room from east at north located at apt 310, 3rd story, 2nd apartment from west at northCiv14 mailed
Nov 28, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 310, 3rd storyNov sent out
Sep 15, 2023§ 27-2005 adm code properly secure the loose sprinkler cap at ceiling located at apt 310, 3rd story, 2nd apartment from north at eastNov sent out
Sep 15, 2023§ 27-2005 hmc: properly repair or replace the broken or defective intercom system from building entrance to apartment wall pannel located at apt 310, 3rd story, 2nd apartment from north at eastNov sent out
Aug 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department south and west wall in the bathroom located at apt 310, 3rd story, 2nd apartment from north at eastNov sent out
Jun 29, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north located at apt 807, 8th story, 4th apartment from north at eastNov certified late
Jun 29, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north located at apt 807, 8th story, 4th apartment from north at eastNov certified late
Apr 20, 2022Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 806, 8th story, 5th apartment from north at eastNov certified late
Apr 20, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east and west wall. in the 2nd room from north located at apt 806, 8th story, 5th apartment from north at eastNov certified late
Apr 20, 2022Section 27-2005 adm code properly repair the broken or defective bell buzzer intercom return system at building entrance to the apartment located at apt 806, 8th story, 5th apartment from north at eastNov certified late