Mar 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th storyNov certified on time
Sep 09, 2021Section 213, subd. 5 m/d law discontinue use of interior room for living or provide a single opening of at least 60 percent of area of the partition to room having window opening directly to street or yard (open spacing less then 60 percent of wall size ) at east wall in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from west at northNov sent out
Sep 09, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles surface with grouted joints/caulking of visible mold at south wall around bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from west at northNov sent out
Sep 09, 2021Section 27-2005 adm code paint metal in accordance with dept. regulation the radiator at west wall in the kitchen located at apt 3r, 3rd story, 1st apartment from west at northNov sent out
Sep 09, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles surface with grouted joints/caulking of visible mold at east and south walls at bathtub in the bathroom located at apt 3l, 3rd story, 1st apartment from west at northNov sent out
Jul 12, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the ceramic tiles surface with grouted joints/caulking of visible mold at east and north walls around bathtub in the bathroom located at apt 3r, 3rd story, apartment at northNov sent out
Mar 25, 2021Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration erected partition wall erected with hollow door creating compactor closet under stair soffit at public hall stairs, 1st storyNov sent out
Sep 22, 2020Section 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3r, 3rd story, 2nd apartment from south at westNov sent out
Mar 05, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 3r, 3rd story, 2nd apartment from south at westNov sent out
Jul 16, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall door in the private hallway located at apt 4l, 4th story, 1st apartment from south at westNot complied with
Feb 12, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st wall cabinet from west at north wall in the private hallway located at apt 4l, 4th story, 1st apartment from south at westNot complied with