75 7 Avenue, Brooklyn, NY 11217

12 Units

Built in 1920

4 Floors

1 year bedbug history: no
Litigation history: yes
Evictions: 0

Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.

20 violations over 12 units

Non-hazardous
7Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Hazardous
8Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Immediately hazardous
5Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Approval DateDescriptionCurrent Status
2022-02-18(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Open
2019-08-01Section 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hallOpen
2019-06-26Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at all parts of fire escape at east facadeOpen
2013-05-15Section 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.Open
2013-05-15Section 27-2005 adm code properly repair the broken or defective bell buzzer and intercom system in the foyer located at apt 3b, 4th story, 1st apartment from west at northOpen
2013-04-30Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 2b, 3rd story, 2nd apartment from west at northOpen
2013-04-30Section 27-2005 adm code properly repair the broken or defective intercom/ bell buzzer system located at apt 2b, 3rd story, 2nd apartment from west at northOpen

Property Owners and Associates

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60%
of renters recommend this building

60%
of renters approve of this property owner

Rents and Deposits

95% of renters received their safety deposits back

security-deposit

NO reported rent-stabilized units in this building.

rent-stabilized

COVID-19 Measures

Sanitation

sanitation

It has been reported that this building's property owner DID NOT implement new sanitation measures in response to COVID-19.

Rent Flexibility

rent flexibility

It has been reported that this building's property owner DID NOT offer flexible rent arrangements due to the economic stress caused by COVID-19.

Reviews

No reviews yet