795 Putnam Avenue,Brooklyn, NY 11221

6 Units

Built in 1931

4 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
60 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 53 violations which is 8.83 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
23Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
20Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
10Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 28, 2024§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder ... at 1st fire escape from north at westNov sent out
Aug 26, 2020Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st storyNov sent out
Aug 26, 2020Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st storyNov sent out
Aug 26, 2020Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Aug 26, 2020Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Jan 22, 2020Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNov sent out
Jan 22, 2020Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.Nov sent out
Jan 22, 2020Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Nov sent out
Jan 22, 2020Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.Nov sent out
Jan 22, 2020Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missingNov sent out
Jan 22, 2020Section 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at building west sideNov sent out
Jan 22, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at westNov sent out
Jul 12, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Jul 12, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Jul 12, 2019Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ,, at public hall, 1st storyNov sent out
Jan 10, 2019Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedNot complied with
Jan 10, 2019Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNot complied with
Nov 14, 2016Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNot complied with
Nov 14, 2016Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st storyNot complied with
Apr 16, 2015Section 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 4l, 4th story, 1st apartment from north at eastNot complied with
Feb 19, 2015Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the 6th room from north located at apt 3l, 3rd story, apartment at eastNov sent out
Feb 17, 2015Section 27-2013 adm code paint with light colored paint to the satisfaction of this department south wall in the 4th room from north located at apt 3l, 3rd storyInvalid certification
Feb 17, 2015Section 27-2013 adm code paint with light colored paint to the satisfaction of this department south wall in the kitchen located at apt 3l, 3rd story, apartment at eastInvalid certification

Property Owners and Associates

10k Management Inc
Agent
2.8(2)

4 Properties

49 Units

795 Putnam Avenue Housing Corp
Owner, Corporate Owner
2.1(1)

2 Properties

24 Units

Darold Trotter
Head Officer
2.1(1)

1 Property

6 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Drugs are being sold in the building. 795,797,799 Not a safe place to live
Former Tenant
Pros:
There isn’t anything I like
Cons:
People hanging out on the (c) openigloo stoop s...
Advice to owner:
They need to kick the guy Dumont aka Gregory an...