137 Mac Donough Street,

Brooklyn, NY 11216

8 Units

Built in 1903

4 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform

Available listings in 137 Mac Donough Street

Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 34 violations which is 4.25 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.59 violations per unit.
Non-hazardous
17Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
11Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
6Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
2022-01-18Section 27-2041 adm code provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door leading to rear yard , north wall, in the 2nd private hallway located at apt 1l lower level, 1st story, 1st apartment from west at northNov sent out
2022-01-18Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling ceiling in the 3rd bathroom from north at east located at apt 1l, 1st story, 1st apartment from west at northViolation will be reinspected
2022-01-18Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator from south at west wall, 1st radiator from east at south wall in the 5th room from north located at apt 1l, 1st story, 1st apartment from west at northViolation will be reinspected
2022-01-18Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north located at apt 1l, 1st story, 1st apartment from west at northViolation will be reinspected
2022-01-18Section 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1l upper level, 1st story, 1st apartment from west at northViolation will be reinspected
2019-08-16Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 1r, 1st story, 2nd apartment from west at northNot complied with
2019-08-16Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from north at east wall in the 4th room from north located at apt 1r, 1st story, 2nd apartment from west at northNot complied with
2019-08-16Section 27-2005 adm code replace with new the broken or defective ceramic floor tiles in the kitchen located at apt 1r, 1st story, 2nd apartment from west at northNot complied with
2019-08-09Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall in the 3rd room from north located at apt 4r, 4th story, 2nd apartment from west at northViolation will be reinspected
2019-08-09Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall in the kitchen located at apt 4r, 4th story, 2nd apartment from west at northViolation will be reinspected
2019-07-05Section 27-2005 adm code replace with new the broken or defective escutcheon plate at ceiling in the 2nd room from east located at apt 1r, 1st story, 2nd apartment from north at eastNot complied with
2019-07-02Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from north at east wall, 1st door frame from north at east wall in the bathroom located at apt 1r, 1st story, 2nd apartment from north at eastNot complied with
2019-06-26Section 27-2005 adm code paint metal in accordance with dept. regulation all riser heating pipes in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at northNot complied with
2019-06-26Section 27-2005 adm code replace with new the missing heat riser escutcheon plate at ceiling in the entire apartment located at apt 2r, 2nd story, 2nd apartment from west at northNot complied with
2019-06-26Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at northFirst no access to re- inspect violation
2019-06-26Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint north fire escape at building rearViolation will be reinspected
2019-06-26Section 27-2005 adm code replace with new the missing heat riser escutcheon plate at ceiling in the entire apartment located at apt 1r, 1st story, 2nd apartment from west at northNot complied with
Property Owners and Associates
137 Macdonough Residences, LLC
Corporate Owner
3.3(3)

2 Properties

17 Units

1509 Pacific Residences, LLC
Owner
3.4(4)

4 Properties

31 Units

759 St. Nicholas Residences, LLC
Corporate Owner
3.4(28)

35 Properties

551 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.
Reviews

Bed Bugs Beware

Former Tenant
Pros:
The interiors were new, but the layout was terr...
Cons:
There were bed bugs in the walls. The hallways ...
Advice to owner:
Get rid of the bed bugs and take care of your e...
Report