Oct 18, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 1sqft around entrance of door way. in the entrance located at apt 6j, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Oct 18, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the entrance located at apt 6j, 6th story, 1st apartment from south at westFirst no access to re- inspect violation
Oct 18, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 6j, 6th story, 1st apartment from south at westFirst no access to re- inspect violation
Oct 18, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the entrance located at apt 6j, 6th story, 1st apartment from north at eastCiv14 mailed
Oct 18, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the entrance located at apt 6j, 6th story, 1st apartment from south at westCiv14 mailed
Oct 18, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 2sqft at west wall in the foyer located at apt 6j, 6th story, 1st apartment from north at eastFirst no access to re- inspect violation
Oct 10, 2023§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspectedFirst no access to re- inspect violation
Oct 10, 2023§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyFirst no access to re- inspect violation
Oct 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at the ceiling ,in east sections, at public hall, 6th storyFirst no access to re- inspect violation
Oct 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at the ceiling and all walls ,in east sections, at 1st public hall bulkhead from eastFirst no access to re- inspect violation
Nov 29, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and west wall at public hall, 1st storyFirst no access to re- inspect violation