423 East 98 Street,Brooklyn, NY 11212

35 Units

Built in 1930

4 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
402 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 173 violations which is 4.94 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
27Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
94Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
52Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 30, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 5 sq ft at north wall in the 4th room from north located at apt 1b, 2nd story, 1st apartment from north at east , section at southNotice of issuance sent to tenant
Feb 25, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls at lobby, 1st storyNov certified on time
Feb 25, 2024§ 27-2011 adm code cleanse to the satisfaction of this department the all walls at lobby, 1st storyNov sent out
Feb 21, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood base flooring at south wall base cabinet in the kitchen located at apt b5, 2nd story, 2nd apartment from south at westNov sent out
Feb 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 1st room from east at south located at apt 10d, 4th story, 1st apartment from north at east , section at northCiv14 mailed
Feb 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen , the bathroom , the 1st room from east at center located at apt 10d, 4th story, 1st apartment from north at east , section at northCiv14 mailed
Feb 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the 1st room from east at north located at apt 10d, 4th story, 1st apartment from north at east , section at northCiv14 mailed
Feb 01, 2024§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at the south wall in the bathroom located at apt 10d, 4th story, 1st apartment from north at east , section at northCiv14 mailed
Feb 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 1 sq ft at the 1st window frame from west at north wall in the bathroom located at apt 10d, 4th story, 1st apartment from north at east , section at northFirst no access to re- inspect violation
Feb 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 2 sq ft at the north wall in the bathroom located at apt 10d, 4th story, 1st apartment from north at east , section at northFirst no access to re- inspect violation
Feb 01, 2024§ 27-2026 adm code repair leaky water closet flush pipe connection in the bathroom located at apt 10d, 4th story, 1st apartment from north at east , section at northCiv14 mailed
Feb 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 1 sq ft at the east wall in the bathroom located at apt 10d, 4th story, 1st apartment from north at east , section at northFirst no access to re- inspect violation
Nov 24, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department east wall at vestibule , 1st storyNov certified on time
Nov 24, 2023§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant wall at east at vestibule , 1st storyNov certified on time
Aug 27, 2023§ 27-2005 adm code properly secure the loose wood wall cabinets at south wall in the kitchen located at apt 4c, 3rd story, 1st apartment from south at west , section ''south''Nov sent out
Aug 27, 2023§ 27-2005 adm code properly repair with similar material the broken or defective lower wood base cabinets underneath the sink in the kitchen located at apt 4c, 3rd story, 1st apartment from south at west , section ''south''Nov sent out
Aug 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings throughout in the entire apartment located at apt 4c, 3rd story, 1st apartment from south at west , section ''south''Nov sent out
Dec 09, 2022Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tile at west wall in the bathroom located at apt c10, 3rd story, 1st apartment from north at eastNot complied with
Jun 27, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 1st room from east at south located at apt 10d, 4th story, 1st apartment from north at eastFirst no access to re- inspect violation
Jun 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from east at south located at apt 10d, 4th story, 1st apartment from north at eastFirst no access to re- inspect violation
Jun 27, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at north located at apt 10d, 4th story, 1st apartment from north at eastFirst no access to re- inspect violation
Jun 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the 1st room from east at north located at apt 10d, 4th story, 1st apartment from north at eastFirst no access to re- inspect violation
Jun 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the bathroom , the 1st room from east at center located at apt 10d, 4th story, 1st apartment from north at eastFirst no access to re- inspect violation
Jun 18, 2022Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor defective at public hall, 1st storyNov certified on time
Jun 18, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st storyNov certified on time
Apr 12, 2022§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts, and all components at all stories , 2nd stack from west at south. at fire escapeNot complied with
Sep 29, 2014Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east , section at westNot complied with

Property Owners and Associates

Mario Savala
Site Manager
2.1(1)

1 Property

35 Units

Rh 1704 East New York Ave LLC
Agent, Head Officer, Officer
2.1(1)

3 Properties

44 Units

Rh 912 Saratoga Ave LLC
Corporate Owner
2.1(1)

2 Properties

38 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Building safety a must
Former Tenant
Pros:
History, parking, affordable
Cons:
Roaches, Mices, crackheads