Sep 21, 2023§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Sep 21, 2023§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Sep 21, 2023§ 27-2005 hmc: properly repair or replace the broken or defective bathtub shower door off track in the bathroom located at apt d6, 4th story, 1st apartment from south at westNov sent out
Apr 08, 2023Section 27-2005 adm code refit doors at wall cabinets in the kitchen located at apt d6, 4th story, 2nd apartment from south at westNov sent out
Apr 08, 2023Section 27-2005 adm code paint metal in accordance with dept. regulation at heat riser in the bathroom located at apt d6, 4th story, 2nd apartment from south at westNov sent out
Aug 29, 2019Section 27-2005 adm code properly repair the broken or defective wood floor in the foyer located at apt c4, 3rd story, apartment at south , section at westNov sent out
Aug 28, 2019Section 27-2005 adm code properly repair the broken or defective eastwall cabinet in the kitchen located at apt c4, 3rd story, apartment at south , section at westNov sent out
Aug 23, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt c4, 3rd story, apartment at south , section at westNov sent out
Aug 23, 2019Section 27-2005 adm code replace with new the broken or defective refrigerator door gasket in the kitchen located at apt c4, 3rd story, apartment at south , section at westInvalid certification
Apr 29, 2018Section 27-2005 adm code replace with new the broken or defective gasket at refrigerator door in the kitchen located at apt c4, 3rd story, 1st apartment from east at southNot complied with
Apr 29, 2018Section 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt c4, 3rd story, 1st apartment from east at southNot complied with
Apr 19, 2016Section 27-2005 adm code replace with new the missing safety cover plate at electrical outlets ( total of 2 ) at public hall, 1st storyNot complied with