50 Legion Street,Brooklyn, NY 11212

81 Units

Built in 1982

3 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
171 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 77 violations which is 0.95 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
17Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
50Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
9Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Apr 16, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the private hallway located at apt 8a, 1st story, 1st apartment from west at northNov sent out
Apr 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt 8a, 1st story, 1st apartment from west at northNov sent out
Oct 02, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 7b, 2nd story, 1st apartment from south at westNov sent out
Oct 02, 2023§ 27-2005 hmc: properly repair or replace the broken or defective wood base cabinets in the kitchen located at apt 7b, 2nd story, 1st apartment from south at westNov sent out
Oct 02, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor at in the 2nd room from east located at apt 7b, 2nd story, 1st apartment from south at westNov sent out
Oct 02, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings throughout in the entire apartment located at apt 7b, 2nd story, 1st apartment from south at westNov sent out
Jun 14, 2021Section 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4g, 1st story, 1st apartment from east at southNov sent out
Jun 14, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 4g, 1st story, 1st apartment from east at southNov sent out
Oct 04, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the baseboard at west wall in the 1st room from north located at apt 4b, 2nd story, 1st apartment from north at eastNov sent out
Jun 28, 2016Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... on north wall approx 2 sq. ft. in the 1st room from north at east located at apt 4b, 2nd story, 1st apartment from north at eastNov sent out
Jan 29, 2016Section 27-2005 adm code refit door leading to bacony in the 2nd room from north located at apt 4b upper level, 1st story, 1st apartment from north at eastNov sent out
Aug 13, 2015Section 27-2011 adm code cleanse to the satisfaction of this department the duct work located at apt 4b, 1st story, 1st apartment from north at eastNot complied with
Aug 13, 2015Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak over closet ceiling upper level located at apt 4b, 1st story, 1st apartment from north at eastNot complied with
Aug 13, 2015Section 27-2005 adm code refit patio door (grafton ave entrance) located at apt 4b, 1st story, 1st apartment from north at eastNot complied with
Aug 08, 2015Section 27-2005 adm code properly repair the broken or defective terrace door exterior glass frame molding, in the 1st room from east located at apt 4b upper level, 1st storyNot complied with
Jul 30, 2015Section 27-2013 adm code paint with light colored paint to the satisfaction of this department closet ceiling and walls, 3 story duplex apt in the private hallway located at apt 4b, 2nd storyNot complied with

Property Owners and Associates

Amarilys Echevarria
Site Manager
2.3(3)

4 Properties

162 Units

Brownsville Associates
Corporate Owner
2.3(3)

4 Properties

162 Units

Donald Miller
Officer
2.3(3)

4 Properties

162 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

My opinion of property
Former Tenant
Pros:
The layout of the property
Cons:
It’s not being cleaned properly, (c) openigloo ...
Advice to owner:
She should stop utilizing the parking area for ...
Terrible place to live
Former Tenant
Pros:
Good heat and can control (c) openigloo heating...
Cons:
The place has mice, terrible (c) openigloo neig...
Advice to owner:
Instead of trying to move your own people in yo...