141-35 85 Road,Queens, NY 11435

126 Units

Built in 1951

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
364 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 45 violations which is 0.35 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
16Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
19Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
10Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 19, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from north at east located at apt 5c, 5th story, 1st apartment from east at southNov sent out
Jan 13, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4sq feet at north wall in the bathroom located at apt 5c, 5th story, 1st apartment from east at southNotice of issuance sent to tenant
Jan 13, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4sq feet at west wall in the bathroom located at apt 5c, 5th story, 1st apartment from east at southNotice of issuance sent to tenant
Jan 13, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4sq feet at ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from east at southNotice of issuance sent to tenant
Jan 13, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 5c, 5th story, 1st apartment from east at southNov sent out
Jan 13, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... appox 2sq feet east wall in the bathroom located at apt 5c, 5th story, 1st apartment from east at southNotice of issuance sent to tenant
Oct 25, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 6a, 6th story, 3rd apartment from west at northNov sent out
Oct 25, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 6a, 6th story, 3rd apartment from west at northNov sent out
Aug 11, 2021Section 27-2005 adm code properly repair the broken or defective base cabinet door in the kitchen located at apt 1e, 1st story, 1st apartment from south at westNov certified late
Aug 11, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1e, 1st story, 1st apartment from south at westNov certified late
Aug 11, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the foyer , the bathroom , the 3rd room from east located at apt 1e, 1st story, 1st apartment from south at westNov certified late
May 04, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt 6c, 6th story, 1st apartment from east at southNot complied with
May 04, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling, west wall in the 3rd room from north located at apt 6c, 6th story, 1st apartment from east at southNot complied with
Apr 13, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from north located at apt 2a, 2nd story, 5th apartment from west at northNot complied with
May 11, 2017Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... approximately 1 sq ft at north wall, east wall in the 1st room from east at north located at apt 4b, 4th story, 4th apartment from west at north , section ''141-41''First no access to re- inspect violation
May 11, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north located at apt 4b, 4th story, 4th apartment from west at north , section ''141-41''First no access to re- inspect violation

Property Owners and Associates

Allsion Belfer
Site Manager
3.4(4)

2 Properties

252 Units

Briarwood Associates
Corporate Owner
2.9(25)

18 Properties

942 Units

Jeffrey Moskin
Officer, Head Officer
2.9(11)

3 Properties

384 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Good space for the price
Former Tenant
Pros:
Price of the rent
Cons:
Roach infeststion in rooms and (c) openigloo ga...
Advice to owner:
Respond back to your tenants in a timely manner.