Apr 30, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration metal and gypsum wall erected from floor to ceiling creating office with door opening at public hall, 1st storyNov sent out
Sep 22, 2023§ 27-2005 hmc: refit the door in the 1st entrance from north located at b-room 232, 3rd story, 3rd b-room from south at westNov sent out
Aug 17, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department base cabinet at north wall in the kitchen located at apt 154, 5th story, 2nd apartment from north at eastNot complied with
Jun 23, 2019Section 27-2005 adm code replace with new the broken or defective gasket around refrigerator door located at b-room 235, 3rd story, 1st b-room from west at northNot complied with
Jun 23, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls located at b-room 235, 3rd story, 1st b-room from west at northNot complied with
Jun 12, 2019Section 27-2005 adm code paint metal in accordance with dept. regulation riser pipe at north in the room located at b-room 235, 3rd story, b-room at northNot complied with