123 East 129 Street,Manhattan, NY 10037

142 Units

Built in 1984

8 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
272 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 77 violations which is 0.54 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
16Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
45Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
16Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 01, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Feb 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4 square feet at north wall in the 1st room from east located at apt 8p, 8th story, 1st apartment from west at north , section ''l-r''Civ14 mailed
Feb 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 6 square feet at ceiling in the bathroom located at apt 8p, 8th story, 1st apartment from west at north , section ''l-r''Civ14 mailed
Feb 01, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 3 square feet at north wall in the 2nd room from east located at apt 8p, 8th story, 1st apartment from west at north , section ''l-r''Civ14 mailed
Jan 23, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 6 sq ft at window casing in the 1st room from north at east located at apt 8p, 8th story, 1st apartment from west at northCiv14 mailed
Jan 21, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling at lower level in the 2nd room from north located at apt 3 lower level, 1st story, 3rd apartment from east at southCiv14 mailed
Jan 21, 2024§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3, 1st story, 3rd apartment from east at southCiv14 mailed
Dec 26, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 5 sq ft at the ceiling in the 1st room from north located at apt th3 upper level, 1st story, 3rd apartment from east at southNotice of issuance sent to tenant
Aug 31, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 3 sq feet at ceiling, upper level in the private hallway located at apt th13, 1st story, 7th apartment from west at north , section ''north''First no access to re- inspect violation
Aug 25, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles at upper level in the 3rd room from north located at apt th13, 1st story, 7th apartment from west at north , section ''north''First no access to re- inspect violation
Aug 25, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2sq foot at ceiling in the kitchen located at apt th13, 1st story, 7th apartment from west at north , section ''north''First no access to re- inspect violation
Aug 25, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles at lower level in the 1st room from north at west located at apt th13, 1st story, 7th apartment from west at north , section ''north''First no access to re- inspect violation
Aug 25, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department west wall in the bathroom located at apt th13, 1st story, 7th apartment from west at north , section ''north''First no access to re- inspect violation
Nov 25, 2022§ 27-2005 adm code refit sink base cabinet doors in the kitchen located at apt 7d, 7th story, 4th apartment from south at westNot complied with
Aug 18, 2021§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling at public hall, 1st storyNot complied with
Apr 08, 2019§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of suspended ceiling at public hall, 1st storyNot complied with

Property Owners and Associates

Hp Harlem Portfolio Housing Development
Corporate Owner
3.1(13)

34 Properties

1819 Units

Lucrecia Almanzar
Site Manager, Head Officer
3.1(13)

34 Properties

1819 Units

Manhattan North Management Company Inc
Agent
2.8(38)

50 Properties

2066 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet