279 West 118 Street,Manhattan, NY 10026

10 Units

Built in 1910

5 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
67 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 161 violations which is 16.1 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
32Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
98Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
31Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Nov 27, 2023§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 1b, 1st story, 1st apartment from west at northNov sent out
Nov 27, 2023§ 27-2011 adm code cleanse to the satisfaction of this department the mold on grout at north ceramic wall tiles in the bathroom located at apt 1b, 1st story, 1st apartment from west at northNov sent out
Nov 12, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 2a, 2nd story, 1st apartment from east at southNov sent out
Nov 12, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 2a, 2nd story, 1st apartment from east at southNov sent out
Nov 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls in the bathroom located at apt 3b, 3rd story, 1st apartment from west at northNov sent out
Nov 06, 2023§ 27-2005 hmc: properly repair or replace the broken or defective light switch cover in the bathroom located at apt 3b, 3rd story, 1st apartment from west at northNov sent out
Apr 07, 2023Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1b, 1st story, 1st apartment from north at eastNov sent out
Apr 07, 2023Section 27-2037, 2038 hmc: provide a safe and adequate supply of electric service to the fixtures electrical outlet at north wall in the 3rd room from east located at apt 1b, 1st story, 1st apartment from north at eastNov sent out
Apr 07, 2023Section 27-2037, 2038 hmc: provide a safe and adequate supply of electric service to the fixtures electrical outlet at east wall in the 3rd room from east located at apt 1b, 1st story, 1st apartment from north at eastNov sent out
Apr 05, 2023Section 27-2037, 2038 hmc: provide a safe and adequate supply of electric service to the fixtures at south wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at eastNov sent out
Dec 09, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east located at apt 1b, 1st story, 1st apartment from west at northNov sent out
Nov 04, 2022Section 27-2005 adm code properly repair the broken or defective intercom system from building entrance to foyer located at apt 5a, 5th story, 1st apartment from east at southNov sent out
Dec 16, 2021Section 27-2005 adm code properly repair with similar material the broken or defective wood door in the bathroom located at apt 1b, 1st story, 1st apartment from west at northNov sent out
Dec 16, 2021Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all componets at all balconies at all stories at south fire escapeNot complied with
Nov 05, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the bathroom located at apt 1b, 1st story, 1st apartment from west at northNov sent out
Nov 05, 2021Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint the fire escape at building frontNot complied with
Nov 28, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
May 17, 2018Section 27-2005 adm code refit the entrance door in the 2nd room from north at west located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Feb 13, 2018Section 27-2005 adm code refit entrance door in the 3rd room from north at west located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Feb 13, 2018Section 27-2005 adm code replace with new the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Dec 01, 2017Section 27-2005 adm code replace with new the missing cabinet door under sink in the kitchen located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Dec 01, 2017Section 27-2005 adm code refit entrance door in the 3rd room from north at west located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Dec 01, 2017Section 27-2005 adm code refit entrance door in the bathroom located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Jun 22, 2017Section 27-2005 adm code refit doors at base cabinet at west wall in the kitchen located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Jun 22, 2017Section 27-2005 adm code refit door at base cabinet at east wall in the kitchen located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Jun 22, 2017Section 27-2005 adm code refit door at sink cabinet at south wall in the kitchen located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Jun 22, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and west wall in the 2nd room from north at east located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Jun 14, 2017Section 27-2005 adm code refit the wooden door in the bathroom located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Jun 14, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and west wall in the 2nd room from north at east located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Jun 14, 2017Section 27-2005 adm code refit upper and lower cabinet doors in the kitchen located at apt 2b, 2nd story, 1st apartment from west at northNov sent out
Jan 05, 2017Section 27-2005 adm code refit the door in the bathroom located at apt 2b, 2nd story, 1st apartment from west at northNot complied with
May 15, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and north wall in the bathroom located at apt 2b, 2nd story, 1st apartment from west at northNov sent out

Property Owners and Associates

Geddes Bux
Officer
0(0)

4 Properties

40 Units

Housing 2000 Hdfc
Corporate Owner
1(1)

18 Properties

338 Units

Housing 2000 Housing Development Fund CO Rp
Owner
0(0)

7 Properties

63 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet