151 West 140 Street,

Manhattan, NY 10030

55 Units

Built in 1903

7 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
443 complaints
See all 311 complaints about this building in a rental report

Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 256 violations which is 4.65 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
61Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
147Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
47Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Jul 11, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at surface of bathtub in the bathroom located at apt 5g, 5th story, 5th apartment from east at southNov sent out
Jul 11, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at surface of bathtub in the bathroom located at apt 3h, 3rd story, 1st apartment from west at northNov sent out
Jul 11, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 3h, 3rd story, 1st apartment from west at northNov sent out
Jul 11, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilng at public hall, 7th story, section ''west''Nov sent out
Jul 05, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 1 sq ft at 2nd window stool from east in the 4th room from north located at apt 5g, 5th story, 6th apartment from east at southNotice of issuance sent to tenant
Jun 20, 2023§ 27-2005 hmc: properly repair or replace the broken or defective lower window sash spring balance at north wall offset #1 in the 3rd room from east located at apt 3a, 3rd story, 2nd apartment from west at northNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 4th storyNov sent out
Jun 19, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 5d, 5th story, 3rd apartment from east at southNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 1st storyNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 2nd storyNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd storyNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at window sill at offset 1 and 2 at south wall at public hall, 6th storyNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th storyNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at bulkhead at public hall, 7th storyNov sent out
Jun 19, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 3h, 3rd story, 1st apartment from west at northNov sent out
Jun 19, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 3h, 3rd story, 1st apartment from west at northNov sent out
Jun 19, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 3h, 3rd story, 1st apartment from west at northNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the foyer located at apt 5b, 5th story, 1st apartment from east at southNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from north located at apt 5b, 5th story, 1st apartment from east at southNov sent out
Jun 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at window sill offset # 2 at south wall in the 6th room from north located at apt 5g, 5th story, 6th apartment from east at southNov sent out
Apr 27, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from east located at apt 7a, 7th story, 2nd apartment from west at northNov sent out
Apr 27, 2023Section 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at surface of bath tub in the bathroom located at apt 5d, 5th story, 3rd apartment from east at southNov sent out
Apr 27, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls at public hall, 2nd storyNov sent out
Apr 27, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls at public hall, 3rd storyNov sent out
Apr 27, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls at public hall, 1st storyNov sent out
Apr 27, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls at public hall, 4th storyNov sent out
Apr 27, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 7th story, section ''west''Nov sent out
Mar 16, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Nov 25, 2022Section 27-2005 adm code refit wood cabinet door at north side in the kitchen located at apt 5d, 5th story, 2nd apartment from west at northNov sent out
Nov 02, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 2f, 2nd story, 5th apartment from east at southNov sent out
Jun 21, 2022Section 27-2011 adm code cleanse to the satisfaction of this department the mold at grout west wall tiles in the bathroom located at apt 1g, 1st story, 1st apartment from east at southNov sent out
Apr 20, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls at public hall, 1st storyNov sent out
Feb 24, 2022Section 27-2005 adm code properly repair with similar material the broken or defective caulking at bath tub in the 4th bathroom from north at east located at apt 3b, 3rd story, 1st apartment from east at southNov sent out
Feb 24, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 7a, 7th story, 2nd apartment from west at northNov sent out
Feb 24, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 3rd room from east located at apt 7a, 7th story, 2nd apartment from west at northNov sent out
Feb 16, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Dec 23, 2021Section 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 4a, 4th story, 2nd apartment from west at northNov sent out
Dec 23, 2021Section 27-2005 adm code properly repair the broken or defective electrical outlets at north wall in the 1st room from north located at apt 4a, 4th story, 2nd apartment from west at northNov sent out
Nov 26, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 1c, 1st story, 1st apartment from east at southNov sent out
Nov 26, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls all trims and ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from east at southNov sent out
Oct 08, 2021Section 27-2005 adm code refit door in the entrance located at apt 1g, 1st story, 2nd apartment from east at south , section at northwestInvalid certification
Jul 29, 2021Section 27-2026 adm code repair leaky water closet flush pipe connection in the bathroom located at apt 1g, 1st story, 4th apartment from east at southNov sent out
Jul 07, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the the 2sqf mold caulkiing at bath tub in the bathroom located at apt 1g, 1st story, 1st apartment from east at southNov sent out
Jun 29, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the bathroom located at apt 1c, 1st story, 2nd apartment from east at southNov sent out
Jun 29, 2021Section 27-2005 adm code refit closet door in the 3rd room from north located at apt 1c, 1st story, 2nd apartment from east at southNov sent out
Jun 29, 2021Section 27-2005 adm code replace with new the broken or defective entrance door in the 3rd room from north located at apt 1c, 1st story, 2nd apartment from east at southNov sent out
Jun 29, 2021Section 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at south wall at public hall, 4th storyNov sent out
Jun 29, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall at public hall, 4th storyNov sent out
Aug 23, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls in the bathroom located at apt 4a, 4th story, 2nd apartment from west at northFirst no access to re- inspect violation
Aug 23, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 4a, 4th story, 2nd apartment from west at northFirst no access to re- inspect violation
Jul 29, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, east and west walls in the bathroom located at apt 4a, 4th story, 2nd apartment from west at northFirst no access to re- inspect violation
Jul 29, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall in the 3rd room from east located at apt 4a, 4th story, 2nd apartment from west at northFirst no access to re- inspect violation
Jul 29, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 4a, 4th story, 2nd apartment from west at northFirst no access to re- inspect violation
Jun 29, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from north, the 5th room from north, the private hallway , the 6th room from north located at apt 4g, 4th story, 5th apartment from east at southNot complied with
Mar 08, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 2nd bathroom from north located at apt 4a, 4th story, 3rd apartment from south at westFirst no access to re- inspect violation
Mar 08, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the kitchen located at apt 4a, 4th story, 3rd apartment from south at westFirst no access to re- inspect violation
Jan 10, 2020Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak the ceiling in the kitchen located at apt 4a, 4th story, 2nd apartment from west at northFirst no access to re- inspect violation
Jan 10, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 4a, 4th story, 2nd apartment from west at northFirst no access to re- inspect violation
May 30, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt 2b, 2nd story, 1st apartment from east at southNot complied with
May 30, 2018Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from east at southNot complied with
May 30, 2018Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... at ceiling , approximately 3 square feet in the bathroom located at apt 2c, 2nd story, 2nd apartment from east at southFirst no access to re- inspect violation

Property Owners and Associates

7th Avenue Lemor LLC
Owner, Corporate Owner, Agent
1.9(3)

20 Properties

429 Units

Dawn Patterson
Officer
2.1(2)

14 Properties

327 Units

Harrison Rayford
Head Officer
1.9(4)

23 Properties

479 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Full of Bed Bugs. Unsafe property
Former Tenant
Pros:
Location is the only benefit
Cons:
Constant Bed bug issues. Constant (c) openigloo...
Advice to owner:
Take care of your property.