Mar 21, 2024§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroom located at apt 1a, 1st story, 1st apartment from north at eastNov sent out
Feb 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 1 sq ft at south wall, 1 sq at ceiling, 2 sq ft at west wall, and 1 sq ft at east wall in the bathroom located at apt 5b, 5th story, 1st apartment from west at northCiv14 mailed
Aug 09, 2023§ 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet flushi handle in the bathroom located at apt 2a, 2nd story, 1st apartment from south at westNot complied with
Jan 05, 2023§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2a, 2nd story, 1st apartment from east at southNot complied with