Apr 01, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 19, 2023Section 27-2005 adm code properly repair with similar material the broken or defective ceramic-tiles floor in the bathroom located at apt 2e, 2nd story, 1st apartment from south at westNov sent out
Apr 19, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 2e, 2nd story, 1st apartment from south at westNov sent out
Apr 11, 2023Section 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2e, 2nd story, 1st apartment from south at westNov sent out
Apr 11, 2023Section 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 2e, 2nd story, 1st apartment from south at westNov sent out
May 12, 2021Section 27-2005 adm code refit closet door in the 4th room from east located at apt 2e, 2nd story, 3rd apartment from south at westNot complied with
May 12, 2021Section 27-2005 adm code paint metal in accordance with dept. regulation riser pipe at east in the bathroom located at apt 2e, 2nd story, 3rd apartment from south at westNot complied with
Jul 19, 2020Section 27-2005 adm code properly secure the loose escutcheon plate at ceiling around heat riser in the bathroom located at apt 4a, 4th story, 2nd apartment from north at eastNov sent out
Jul 19, 2020Section 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 4a, 4th story, 2nd apartment from north at eastNov sent out
Jul 19, 2020Section 27-2005 adm code refit entrance door in the bathroom located at apt 4a, 4th story, 2nd apartment from north at eastNov sent out
Jul 19, 2020Section 27-2005 adm code replace with new the broken or defective gasket at lower door at refrigerator in the kitchen located at apt 4a, 4th story, 2nd apartment from north at eastNov sent out
Oct 18, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at bulkhead ceiling and all walls at public hallNov sent out
Oct 18, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 6th storyNov sent out
Oct 11, 2019Section 27-2011 adm code cleanse to the satisfaction of this department the 6 sq ft at ceramic tiles at north wall in the bathroom located at apt 3e, 3rd story, 3rd apartment from south at westNov sent out