25 Nagle Avenue,
Manhattan, NY 10040

48 Units

Built in 1941

6 Floors

Rent Stabilized Units: Yes
Good Cause Eviction: Yes
Evictions: 1
Litigation History: Yes
1 Year Bedbug History: No
Pet Friendly: Unknown
Building Overview
Building Report
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform

Renters Recommendations

-- of renters recommend this building

-- of renters approve of this owner

Reviews (1)

Over 4 years ago
Here it is
Former Tenant
Pros:
Large apartments and closet space
Cons:
Old pipes and needs updating

Building Ratings

Cleanliness
Garbage Management
Heat
Neighbors
Noise Levels
Owner Responsiveness
Pest Control
Water Pressure

Rents and Deposits

-- of renters received their security deposits back
It dummy text been reported if this building dummy electronic rent payments.
Open Violations
Only open violations from the last 10 years.
Data last updated 2 days ago.
The average number of violations per unit at 25 Nagle Avenue is worse than the city .
BUILDING AVERAGE:
1.31 violations per unit
NEW YORK CITY AVERAGE:
0.81 violation per unit
flag
Non-hazardous
13
class A
i.e. no peephole on a door, or no street # on the building, unlawful keeping of animals
MOST RECENT:
Oct 01, 2025: § 27-2005 adm code properly repair with similar material the broken or defective glazed the porcelain enamel bathtub inner surface in the bathroom located at apt 4d, 4th story, 4th apartment from east at south
Show all
flag
Hazardous
21
class B
i.e. smoke detector issues, inadequate lighting, no lighting for stairways
MOST RECENT:
Oct 01, 2025: § 27-2026 adm code repair the broken or defective connection waste drain line under the wash basin in the kitchen located at apt 4d, 4th story, 4th apartment from east at south
Show all
flag
Immediately hazardous
28
class C
i.e. rodents, pest, mold, inadequate heat or hot water, defective building parts
MOST RECENT:
Oct 02, 2025: § 27-2056.7, 27-2056.8, 27-2056.9 adm code -certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4d, 4th story, 4th apartment from east at south
Show all
flag
Missing information/filings
1
class I
Missing or non-compliant with administrative information orders or filings
MOST RECENT:
Feb 20, 2025: § 27-2091(c) adm code the property has been issued an order to identify and address underlying conditions and violations related to the order. failure to comply may result in extensive repair work to correct underlying conditions and related violations by hpd. charges for repair work done pursuant to this order, if not paid, will become tax liens on the property
Show all
Property Owners and Associates
E
Elgan Realty
2.8(1)
Corporate Owner
1 Property48 Units
Litigation History: Yes
Evictions: 1
J
Jay Rawicki
2.8(1)
Agent
1 Property48 Units
Litigation History: Yes
Evictions: 1
C
Corp
2.8(1)
Corporate Owner
1 Property48 Units
Litigation History: Yes
Evictions: 1
L
Lucos Ramos
2.8(1)
Site Manager
1 Property48 Units
Litigation History: Yes
Evictions: 1

Renter Q&A

ask-question
Be the first to ask a question!
Frequently Asked Questions
Unlock insights about this building
Review your building to unlock access to tenant reviews OR purchase access to unlock insights about violations, complaints, infestations, and more.
Already have an account?Login Here