2809 Frederick Douglass Boulevard,Manhattan, NY 10039

22 Units

Built in 1900

5 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
634 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 246 violations which is 11.18 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
45Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
156Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
45Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Jan 18, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and the ceiling at public hall, 4th storyNov sent out
Jan 17, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 20 sq ft at the ceiling, 5 sq ft at the south wall, and 5 sq ft at the east wall at public hall, 5th storyNov sent out
Jan 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and the ceiling at public hall, 5th storyNov sent out
Jan 13, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and the ceiling at public hall, 3rd storyNov sent out
Jan 13, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and the ceiling at public hall, 2nd storyNov sent out
Dec 28, 2023§ 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 5d, 5th story, 1st apartment from south at westNov sent out
Dec 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and east wall , 5th storyNov sent out
Dec 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th storyNov sent out
Dec 26, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 4th storyNov sent out
Dec 26, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and east wall at public hall, 5th storyNov sent out
Nov 17, 2023§ 27-2005 hmc: properly repair or replace the broken or defective cabinet door at south wall in the kitchen located at apt 3a, 3rd story, 1st apartment from north at eastNov sent out
Nov 17, 2023§ 27-2005 hmc: properly repair or replace the broken or defective electrical switch at north wall in the kitchen located at apt 3a, 3rd story, 1st apartment from north at eastNov sent out
Nov 17, 2023§ 27-2005 hmc: properly repair or replace the broken or defective electrical switch at north wall in the 3rd room from north at east located at apt 3a, 3rd story, 1st apartment from north at eastNov sent out
Nov 17, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings and walls in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at eastNov sent out
Oct 17, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and east wall at public hall, 5th storyNov sent out
Sep 22, 2023§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at fire escape at the building frontNov sent out
Aug 23, 2023§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at fire escape at building frontNov sent out
Aug 10, 2023§ 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 5d, 5th story, 1st apartment from south at westNov sent out
Aug 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 5d, 5th story, 1st apartment from south at westNov sent out
Aug 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall at public hall, 5th storyNov sent out
Aug 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall and ceiling at public hall, 4th storyNov sent out
Jul 26, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and south and east walls at 1st public hall bulkhead from northNov sent out
Jul 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at the east wall at public hall, 5th storyNov sent out
May 25, 2023§ 27-2026 adm code repair leaky water closet flush pipe connection .. in the 2nd bathroom from east at north located at apt 5d, 5th story, 1st apartment from south at westNov sent out
May 25, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 5d, 5th story, 1st apartment from south at westNov sent out
Dec 10, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from east located at apt 5d, 5th story, 1st apartment from west at northFirst no access to re- inspect violation
Dec 10, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, west and east walls in the private hallway located at apt 5d, 5th story, 1st apartment from west at northFirst no access to re- inspect violation
Oct 27, 2022§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Oct 17, 2022§ 27-2005 adm code properly repair the broken or defective mechanical ventilation system at ceiling in the kitchen located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Oct 17, 2022§ 27-2026 adm code repair leaky water closet flush pipe connection .. in the bathroom located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Oct 17, 2022§ 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Oct 17, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th storyNot complied with
Apr 21, 2022§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Jan 04, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall in the 1st room from east located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Jan 04, 2022§ 27-2026 adm code repair leaky water closet flush pipe connection ... in the bathroom located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Aug 26, 2021§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
May 21, 2021§ 27-2026 adm code repair the broken or defective connection at drain line under sink in the kitchen located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
May 14, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings through-out in the entire apartment located at apt 5d, 5th story, 5th apartment from east at southFirst no access to re- inspect violation
Mar 22, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Mar 22, 2021§ 27-2005 adm code properly repair with similar material the broken or defective at wood floor in the 2nd room from north located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Mar 22, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Mar 19, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at west located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 05, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 5d, 5th story, 1st apartment from south at westFirst no access to re- inspect violation
Nov 09, 2017§ 27-2005 adm code properly repair the broken or defective bell/buzzer/intercom located at apt 3c, 3rd story, 2nd apartment from east at southFirst no access to re- inspect violation
Nov 09, 2017§ 27-2005 adm code properly repair the broken or defective caulk at sink counter top in the kitchen located at apt 3c, 3rd story, 2nd apartment from east at southFirst no access to re- inspect violation

Property Owners and Associates

Central Harlem Bradhurst
Corporate Owner
3.1(2)

4 Properties

39 Units

Israel Garcia
Site Manager
0(0)

3 Properties

22 Units

Ken Wray
Head Officer
2.6(7)

38 Properties

799 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet