In the past three years, this building had:
1000 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 276 violations which is 0.9 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
44Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
171Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
61Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 16, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 26, 2024§ 27-2005 adm code properly repair with similar material the broken or defective silicone caulking around bathtub in the bathroom located at apt 26c, 26th story, 1st apartment from south at westNov sent out
Feb 27, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st bathroom from east located at apt 19i, 19th story, 1st apartment from north at eastNov sent out
Feb 18, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls , 26th storyNov sent out
Feb 02, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling at compactor closet, 26th storyNov sent out
Jan 29, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of acoustic drop ceiling, at public hall, 1st storyNov sent out
Jan 27, 2024§ 27-2005 adm code properly repair with similar material the broken or defective viinyl floor tiles in the kitchenette located at apt 4j, 4th story, 1st apartment from east at southNov sent out
Jan 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department east wall in the kitchen located at apt 1k, 2nd story, 2nd apartment from east at southNov sent out
Nov 30, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 25c, 25th story, 1st apartment from west at northNov sent out
Nov 15, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at window at north wall in the 4th room from east located at apt 25h, 25th story, 5th apartment from west at northNov sent out
Oct 31, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall in the 1st room from north located at apt 5g, 5th story, 1st apartment from west at northNov sent out
Oct 31, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall at compactor closet at public hall, 26th storyFirst no access to re- inspect violation
Jun 03, 2023Section 27-2026 adm code repair the leaky and/or defective faucets at sink in the kitchen located at apt 1k, 1st story, 2nd apartment from east at south , section ''bldg2''Nov sent out
Jun 03, 2023Section 27-2005 hmc: properly repair or replace the broken or defective ventilation system at west wall in the bathroom located at apt 1k, 1st story, 2nd apartment from east at south , section ''bldg2''Nov sent out
May 13, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at wall around the window in the 2nd room from east located at apt 1e, 2nd story, 2nd apartment from south at westNov sent out
Mar 03, 2023Section 27-2005 adm code replace with new the broken or defective electrical outlet at west wall in the 1st room from east located at apt 1k, 1st story, 2nd apartment from east at southNov sent out
Mar 02, 2023Section 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 1k, 1st story, 2nd apartment from east at southNov sent out
Mar 01, 2023Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 14f, 14th story, 3rd apartment from west at northNov sent out
Feb 19, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall at compactor closet, 26th storyFirst no access to re- inspect violation
Jun 09, 2022Section 27-2005 adm code replace with new the broken or defective electrical outlet cover at east wall in the 5th room from east located at apt 9c, 9th story, 1st apartment from south at westNov certified late
Apr 06, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 9c, 9th story, 1st apartment from south at westNov sent out
Mar 30, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 3j, 3rd story, 1st apartment from east at southNov sent out
Mar 29, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 1st bathroom from east located at apt 17i, 17th story, 1st apartment from north at eastNov sent out
Feb 24, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd bathroom from east, the 4th room from east at south located at apt 15c, 15th story, 1st apartment from south at westNov sent out
Feb 15, 2022Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 14f, 14th story, 3rd apartment from east at southNov sent out
Feb 15, 2022Section 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tile in the bathroom located at apt 14f, 14th story, 3rd apartment from east at southNov sent out
Jan 23, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom located at apt 13f, 13th story, 3rd apartment from west at northNov sent out
Oct 27, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 16i, 16th story, 1st apartment from north at eastNov sent out
Oct 27, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall in the bathroom located at apt 16i, 16th story, 1st apartment from north at eastNov sent out
May 20, 2021Section 27-2005 adm code properly secure the loose electrical outlet at east wall in the kitchen located at apt 17b, 17th story, 5th apartment from east at southNov sent out
Apr 26, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the bathroom located at apt 26k, 26th story, 2nd apartment from east at southNov sent out
Apr 15, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 4th room from east at north, the 2nd bathroom from east, the 3rd room from east, the kitchen , the 1st bathroom from east, the 1st room from east at south located at apt 6i, 6th story, 1st apartment from north at eastNov sent out
Dec 05, 2019Section 27-2005 adm code properly repair the broken or defective counter balance at lower sash south window in the 1st room from east located at apt 13b, 13th story, 5th apartment from east at southNov sent out
Dec 05, 2019Section 27-2005 adm code replace with new the missing soap dish at north wall in the bathroom located at apt 13b, 13th story, 5th apartment from east at southNov sent out
Jul 26, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 2nd bathroom , the 1st bathroom located at apt 6i, 6th story, 1st apartment from north at eastNov sent out
Mar 10, 2019Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2e, 2nd story, 1st apartment from west at northNov sent out
Nov 17, 2017Section 27-2005 adm code properly repair the broken or defective north door in the 4th room from east at north located at apt 19i, 19th story, 1st apartment from north at eastNot complied with
Nov 11, 2017Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall constructed from plywood from floor to ceiling with door and door frame attached in the 3rd room from east located at apt 19i, 19th story, 1st apartment from north at eastNov sent out
Apr 07, 2017Section 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 15j, 15th story, 1st apartment from east at southNot complied with
Dec 13, 2016Section 27-2026 adm code repair the broken or defective connection at wash basin drain line in the bathroom located at apt 22f, 22nd story, 3rd apartment from north at eastFirst no access to re- inspect violation
Dec 13, 2016Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling above window frame in the 1st room from north located at apt 22f, 22nd story, 3rd apartment from north at eastFirst no access to re- inspect violation
Dec 13, 2016Section 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at apt 22f, 22nd story, 3rd apartment from north at eastFirst no access to re- inspect violation
Dec 13, 2016Section 27-2026 adm code repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 22f, 22nd story, 3rd apartment from north at eastFirst no access to re- inspect violation
Dec 13, 2016Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 22f, 3rd apartment from north at eastFirst no access to re- inspect violation

Property Owners and Associates

Esplanade Gardens Inc
Corporate Owner
3(3)

4 Properties

1242 Units

Esplanade Gardens Inc.
Site Manager, Officer
3.1(4)

6 Properties

1866 Units

Metro Management Development Inc
Agent
3.6(11)

81 Properties

6628 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

inconsistent water issues for the past four years
Former Tenant
Pros:
good neighbors, concerned about one (c) openigl...
Cons:
Management issues with billing. (c) openigloo ...
Advice to owner:
Financial records corrections and correcting bi...