227 West 149 Street,Manhattan, NY 10039

84 Units

Built in 1928

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
1000 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 70 violations which is 0.83 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
14Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
32Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
24Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 16, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 16, 2024§ 27-2005 hmc: refit closet door at south wall in the foyer located at apt 3b, 3rd story, apartment at east , section at eastNov sent out
Apr 16, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation at riser in the bathroom located at apt 3b, 3rd story, apartment at east , section at eastNov sent out
Feb 24, 2024§ 27-2037, 2038 hmc: provide a safe and adequate supply of electric service to the fixtures electrical outlets at south wall in the 1st room from north at east located at apt 2f, 2nd story, 2nd apartment from west at northFirst no access to re- inspect violation
Mar 29, 2023(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Mar 03, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, ceilings and moldings in the bathroom located at apt 3fbuil, 1st storyNot complied with
Mar 03, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department room north 2 all ceilings, walls and moldings in the entire apartment located at apt 1f, 1st story, 1st apartment from west at northNot complied with
Nov 06, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall in the 2nd room from north at west located at apt 1b, 1st story, 1st apartment from north at east , section ''aka227''First no access to re- inspect violation
Nov 06, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and south wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east , section ''aka227''First no access to re- inspect violation
Mar 19, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 5b, 5th story, 2nd apartment from north at eastFirst no access to re- inspect violation
Oct 06, 2020§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the private hallway located at apt 3c, 3rd story, 2nd apartment from west at north , section ''bldg 2''Not complied with
Oct 06, 2020§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 3c, 3rd story, 2nd apartment from west at north , section ''bldg 2''Not complied with
Oct 06, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall in the bathroom located at apt 3c, 3rd story, 2nd apartment from west at north , section ''bldg 2''Not complied with
Apr 04, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the 3rd room from east at north, the private hallway , the kitchen , the bathroom located at apt 3c, 3rd story, 1st apartment from west at northNot complied with

Property Owners and Associates

David Schorr
Head Officer
3.3(12)

7 Properties

613 Units

Dunbar Owner Ll3683c
Corporate Owner
2.9(8)

10 Properties

549 Units

Dunbar Owner LLC
Agent, Corporate Owner
2.9(8)

10 Properties

549 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet