1081 Teller Avenue,Bronx, NY 10456

8 Units

Built in 1931

4 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
91 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 120 violations which is 15 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
26Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
40Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
54Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 11, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 6th room from east, the bathroom , the 2nd room from east, the 1st room from east located at apt 5, 3rd story, 1st apartment from south at westCiv14 mailed
Apr 03, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Apr 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 4 sq ft at ceiling approx 4 sq ft at east wall in the 1st room from east located at apt 5, 3rd story, 1st apartment from south at westNotice of issuance sent to tenant
Mar 20, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 3 sq. ft. at the ceiling in the 1st room from east located at apt 5, 3rd story, 1st apartment from south at westNotice of issuance sent to tenant
Mar 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the baseboard at north wall in the foyer located at apt 3, 2nd story, 1st apartment from south at westNov sent out
Mar 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3, 2nd story, 1st apartment from south at westNov sent out
Mar 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2 sq. ft. at ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from south at westNotice of issuance sent to tenant
Mar 12, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 5, 3rd story, 1st apartment from south at westNov sent out
Mar 12, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5, 3rd story, 1st apartment from south at westCiv14 mailed
Mar 12, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from south at westCiv14 mailed
Mar 12, 2024§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .... in the bathroom located at apt 5, 3rd story, 1st apartment from south at westCiv14 mailed
Mar 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east, the foyer located at apt 5, 3rd story, 1st apartment from south at westCiv14 mailed
Mar 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east located at apt 5, 3rd story, 1st apartment from south at westCiv14 mailed
Feb 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall in the 1st room from east located at apt 5, 3rd story, 1st apartment from south at west , 1st section from north at eastCiv14 mailed
Feb 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall, ceiling in the kitchen located at apt 5, 3rd story, 1st apartment from south at west , 1st section from north at eastCiv14 mailed
Feb 01, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 5, 3rd story, 1st apartment from south at west , 1st section from north at eastCiv14 mailed
Nov 08, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5, 3rd story, 1st apartment from south at westCiv14 mailed
Nov 08, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 1st room from east, the bathroom , the 2nd room from east located at apt 5, 3rd story, 1st apartment from south at westCiv14 mailed
Oct 23, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north at east located at apt 3, 2nd storyNov certified late
Oct 23, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north located at apt 3, 2nd storyNov certified late
Oct 23, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 4th bathroom from north located at apt 3, 2nd storyNov certified late
Oct 23, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 5th room from north located at apt 3, 2nd storyNov certified late
Oct 23, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 3rd kitchen from north located at apt 3, 2nd storyNov certified late
Jun 25, 2021§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the kitchen located at apt 4, 2nd story, 2nd apartment from south at westNot complied with
Jun 25, 2021§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 4, 2nd story, 2nd apartment from south at westNot complied with
Jun 24, 2019§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 5, 3rd story, 1st apartment from south at westNot complied with

Property Owners and Associates

1081 Teller Ave NY LLC
Owner, Corporate Owner
0(0)

2 Properties

14 Units

Gina Maximilian
Site Manager, Agent, Head Officer
0(0)

8 Properties

225 Units

Icer Of 444 Ralph Avenue LLC
Owner, Corporate Owner
2.7(36)

77 Properties

836 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet