1006 Gerard Avenue,Bronx, NY 10452

76 Units

Built in 1927

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
405 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 208 violations which is 2.73 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
38Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
125Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
45Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 08, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at 6th story public hall at north sectionNov sent out
Mar 08, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sqft at east wall at 6th story public hall at south sectionNov sent out
Mar 01, 2024§ 27-2005 hmc: properly repair or replace the broken or defective mechanical peep hole at door in the entrance located at apt 2e, 5th story, 2nd apartment from north at east , section at northNov sent out
Feb 23, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in vestibule at public hall, 1st storyNov certified on time
Jan 10, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock wall created floor to ceiling subdividing room in the 5th room from north located at apt 4d, 4th story, 3rd apartment from south at west , section at northNov sent out
Nov 03, 2023§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 2e, 5th story, 2nd apartment from north at eastNov sent out
Nov 03, 2023§ 27-2026 adm code repair leaky water closet flush pipe connection ... in the bathroom located at apt 2e, 5th story, 2nd apartment from north at eastNov sent out
Nov 03, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the 2nd room from east located at apt 2e, 5th story, 2nd apartment from north at eastNov sent out
Jul 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2c, 3rd story, 2nd apartment from north at east , 1st section from west at northNov sent out
Jul 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at south located at apt 2c, 3rd story, 2nd apartment from north at east , 1st section from west at northNov sent out
Jul 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 2c, 3rd story, 2nd apartment from north at east , 1st section from west at northNov sent out
Jul 12, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at east wall and at ceiling in the private hallway located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at nort wall and at ceiling in the 1st room from east at south located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling in the 1st room from east at south located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the 1st room from east at south located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Jul 12, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 2nd closet from west at north wall door in the private hallway located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
May 31, 2023Section 27-2011 adm code cleanse to the satisfaction of this department the the floors ,landing and stairs all stories at public hallNov sent out
May 06, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st riser from east at south wall in the kitchen located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
May 06, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, south wall, west wall, 1st riser from south at west wall in the bathroom located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
May 06, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, north wall in the 1st room from east at south located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
May 06, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the private hallway located at apt 2c, 3rd story, 2nd apartment from north at eastNov sent out
Sep 16, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at basementNov sent out
Aug 31, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, ceilings and trim in the entire apartment located at apt 2e, 5th story, 2nd apartment from north at eastFirst no access to re- inspect violation
Jun 30, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling ( main entrance gerard ave ) at basement, 1st story, section ''center''Not complied with
Jun 29, 2021Section 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at north wall approx 2 sq ft in the bathroom located at apt 2e, 5th story, 2nd apartment from north at east , section at northFirst no access to re- inspect violation
Jun 29, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall in the bathroom located at apt 2e, 5th story, 2nd apartment from north at east , section at northFirst no access to re- inspect violation
Jun 15, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 2nd room from east at north, the 1st room from east at south, the private hallway , the bathroom located at apt 4c, 3rd story, 7th apartment from south at westNot complied with
Apr 27, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4c, 3rd story, 7th apartment from south at westNot complied with
Sep 04, 2020Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl at floor in the bathroom located at apt 2c, 3rd story, 2nd apartment from north at eastNot complied with
Apr 09, 2015Section 27-2005 adm code properly repair with similar material the broken or defective reglazed tub in the bathroom located at apt 11f, 6th story, 1st apartment from north at east , section at southFirst no access to re- inspect violation
Apr 09, 2015Section 27-2005 adm code properly repair the broken or defective elecrical outlet at west wall in the 1st room from east at south located at apt 11f, 6th story, 1st apartment from north at east , section at southFirst no access to re- inspect violation
Apr 26, 2014Section 27-2005 adm code properly repair with similar material the broken or defective finish wood floor. in the 3rd room from north at west located at apt 11f, 6th story, 1st apartment from north at east , section at southFirst no access to re- inspect violation

Property Owners and Associates

Angela Gazivoda
Officer
2(6)

33 Properties

1575 Units

Anthony Gazivoda
Shareholder, Head Officer
1.8(11)

36 Properties

1764 Units

Felipe Marrero
Site Manager
2.1(1)

1 Property

76 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Super is Horrible
Former Tenant
Pros:
Very spacious apartments rent is (c) openigloo ...
Cons:
Every month there is a (c) openigloo leak and t...
Advice to owner:
Get a real super who answers they phone and kno...