1112 Gerard Avenue,Bronx, NY 10452

60 Units

Built in 1925

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
180 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 69 violations which is 1.15 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
21Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
32Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
16Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Nov 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the kitchen located at penthouse 34, 4th story, 1st penthouse from east at south , section ''1112'', 1st from east at southCiv14 mailed
Nov 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door in the foyer located at penthouse 34, 4th story, 1st penthouse from east at south , section ''1112'', 1st from east at southCiv14 mailed
Nov 28, 2023§ 27-2005 hmc: properly repair or replace the broken or defective intercom box at north wall in the kitchen located at penthouse 34, 4th story, 1st penthouse from east at south , section ''1112'', 1st from east at southCiv14 mailed
Nov 28, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... 2 square feet at south wall, and 2 square feet at 1st window frame from east at south wall in the bathroom located at penthouse 34, 4th story, 1st penthouse from east at south , section ''1112'', 1st from east at southInvalid certification
Oct 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall in the kitchen located at apt 26, 3rd story, 1st apartment from south at westCiv14 mailed
Oct 10, 2023§ 27-2026 adm code repair leaky water closet flush pipe connection .. in the bathroom located at apt 26, 3rd story, 1st apartment from south at westCiv14 mailed
Oct 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall, east wall, west wall in the 3rd room from east at north located at apt 26, 3rd story, 1st apartment from south at westCiv14 mailed
Oct 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door frame, 1st closet from north at east wall door, 2nd closet from north at east wall door frame, 2nd closet from north at east wall door, west wall in the private hallway located at apt 26, 3rd story, 1st apartment from south at westCiv14 mailed
Oct 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall, west wall, 1st window frame from south at west wall in the 3rd room from east at south located at apt 26, 3rd story, 1st apartment from south at westCiv14 mailed
Oct 10, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom located at apt 26, 3rd story, 1st apartment from south at westCiv14 mailed
Oct 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door in the private hallway located at apt 52, 6th story, 2nd apartment from west at northNov sent out
Oct 05, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer located at apt 52, 6th story, 2nd apartment from west at northInvalid certification
Oct 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 55, 6th story, 2nd apartment from east at southNov sent out
Jul 10, 2022§ 27-2005 adm code replace with new the broken or defective magnetic strip rubber gasket at lower refrigerator door in the kitchen located at apt 41, 4th story, 1st apartment from west at north , section ''1112''First no access to re- inspect violation
Jul 10, 2022§ 27-2005 adm code properly repair with similar material the broken or defective vinyl tiles at floor in the foyer located at apt 41, 4th story, 1st apartment from west at north , section ''1112''First no access to re- inspect violation
Jul 10, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling near riser in the bathroom located at apt 41, 4th story, 1st apartment from west at north , section ''1112''First no access to re- inspect violation
Jul 10, 2022§ 27-2005 adm code properly secure the loose faucet knobs at bathtub in the bathroom located at apt 41, 4th story, 1st apartment from west at north , section ''1112''First no access to re- inspect violation
Jul 10, 2022§ 27-2005 adm code replace with new the missing escucheon plate at riser in the bathroom located at apt 41, 4th story, 1st apartment from west at north , section ''1112''First no access to re- inspect violation
Sep 27, 2021§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic drop ceiling in the 2nd room from north located at apt 5, 2nd story, 1st apartment from east at south , section ''1114''First no access to re- inspect violation
Jun 23, 2019§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of drywall and wood stud wall dividing room in the 2nd room from east located at apt 2n, 1st story, 1st apartment from west at north , 1st section from west at northNot complied with
Mar 11, 2016§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock and wooden studs wall erected with door, creating and additional room in the 3rd room from east located at apt 34, 4th story, 1st apartment from east at south , section at southNot complied with

Property Owners and Associates

Agim Duraku
Head Officer
2.2(5)

11 Properties

395 Units

Erica Alayon
Agent
2(2)

1 Property

60 Units

Qc Decatur LLC
Corporate Owner
2.5(12)

120 Properties

1706 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Ok building, few bad neighbors.
Former Tenant
Pros:
Close to transportation, stores, parks.
Cons:
Hallways are dirty, no sleep (c) openigloo duri...
SlumLord Doesn’t Care
Former Tenant
Pros:
I only like that most (c) openigloo of the neig...
Cons:
Let’s start on the presentation (c) openigloo o...
Advice to owner:
DO RIGHT BY YOUR TENANTS!!!!!!!!! STOP CUTTING ...