1133 Boston Road,Bronx, NY 10456

50 Units

Built in 1923

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
209 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 494 violations which is 9.88 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
66Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
237Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
190Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Apr 02, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Feb 15, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling (6 sq. ft.) in the bathroom located at apt a10, 2nd story, 1st apartment from south at westNotice of issuance sent to tenant
Feb 15, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling (2 sq ft.) in the bathroom located at apt a2half, 2nd story, 1st apartment from north at east , section ''north ''Notice of issuance sent to tenant
Feb 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 3rd room from east located at apt b10, 2nd story, 1st apartment from south at west , section ''south''Nov sent out
Feb 15, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at west wall ( 6 sq. ft.) in the bathroom located at apt c5, 4th story, 1st apartment from south at west , section ''north ''Notice of issuance sent to tenant
Feb 15, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color east wall in the foyer located at apt c5, 4th story, 1st apartment from south at west , section ''north ''Nov sent out
Feb 15, 2024§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt d9, 5th story, 2nd apartment from south at west , section ''south ''Nov sent out
Feb 14, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and the west wall at public hall, 1st storyNov sent out
Feb 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4 sq. ft. at east wall in the bathroom located at apt c1, 4th story, 2nd apartment from north at east , section at northNot complied with
Jan 11, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 4, 1st story, 1st apartment from south at west , section ''1133'', 1st from east at southFirst no access to re- inspect violation
Jan 11, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the private hallway , the 2nd room from north at west, the foyer , the 1st room from north at west located at apt 4, 1st story, 1st apartment from south at west , section ''1133'', 1st from east at southFirst no access to re- inspect violation
Oct 26, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation steam radiator at west wall in the kitchen located at apt c3, 4th story, 1st apartment from west at north , section at northNot complied with
Oct 26, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story, section at northNot complied with
Mar 23, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the kitchen located at apt d6, 5th storyNot complied with
Mar 16, 2023(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Dec 13, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east at north, the private hallway , the 1st room from east at south located at apt a6, 2nd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Sep 28, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling, west, east, north and south walls in the kitchen located at apt d6, 5th story, 2nd apartment from east at southNot complied with
Jun 24, 2022§ 27-2005 adm code properly repair the broken or defective bell buzzer intercom system in the entire apartment located at apt c9, 4th story, 2nd apartment from south at westNot complied with
Mar 14, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st storyNot complied with
Aug 02, 2021§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt b5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Aug 02, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall in the kitchen located at apt b5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Aug 02, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the bathroom , the private hallway , the 1st room from north located at apt b5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Jul 27, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east located at apt b5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Jul 14, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 4th room from east located at apt 608, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Jul 14, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and east wall in the 1st room from east located at apt 608, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Jun 14, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north, the 3rd bathroom from east at south, the private hallway , the 1st kitchen from east, the 2nd room from east located at apt 4, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
Jun 04, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the 1st room from north at east located at apt 608, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
May 17, 2021§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .... in the bathroom located at apt a5, 2nd story, 2nd apartment from west at north , section ''east'', at eastFirst no access to re- inspect violation
Apr 30, 2021§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling and west wall in the 1st room from north at east located at apt a6, 2nd story, 2nd apartment from west at north , section ''west''First no access to re- inspect violation
Apr 07, 2021§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color .. ceiling in the kitchen located at apt b4, 3rd story, 2nd apartment from south at westNot complied with
Nov 25, 2020§ 27-2005 adm code properly repair the broken or defective inter com system in the entrance located at apt d2, 5th story, 2nd apartment from west at northNot complied with
Nov 20, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the 4th room from east, the foyer , the kitchen , the bathroom located at apt b2, 3rd story, 2nd apartment from west at northNot complied with
Oct 16, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt a5, 2nd story, 1st apartment from west at northFirst no access to re- inspect violation
Oct 12, 2020§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze in the bathroom located at apt c10, 4th story, 1st apartment from south at west , section at southNot complied with
Jul 19, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ... all walls and ceiling in the entire apartment located at apt c4, 4th story, 2nd apartment from west at northNot complied with
Jul 19, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north, the 2nd room from north, the private hallway , the bathroom , the 1st room from north, the kitchen , the foyer located at apt c4, 4th story, 2nd apartment from west at northNot complied with
Feb 26, 2020§ 27-2005 adm code properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt c10, 4th story, 1st apartment from south at westNot complied with
Dec 09, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from east, the 3rd room from east at north, the private hallway , the bathroom located at apt 4, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
Nov 07, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at south located at apt b4, 3rd story, 2nd apartment from south at westNot complied with
Nov 07, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall, south wall in the 3rd room from east at center located at apt b4, 3rd story, 2nd apartment from south at westNot complied with
Nov 07, 2019§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt b4, 3rd story, 2nd apartment from south at westNot complied with
Nov 07, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at west wall, east wall, south wall, ceiling in the kitchen located at apt b4, 3rd story, 2nd apartment from south at westNot complied with
Nov 07, 2019§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at 2nd closet from west at north wall wall in the foyer located at apt b4, 3rd story, 2nd apartment from south at westNot complied with
Oct 22, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway , the 3rd room from east, the 1st room from east, the kitchen located at apt a1, 2nd story, 2nd apartment from north at east , section at northNot complied with
Oct 17, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 1st room from east, the private hallway located at apt b1, 3rd story, 2nd apartment from north at eastNot complied with
Sep 20, 2019§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood wall partition erected subdiving the room in the 2nd room from north located at apt c5, 4th story, 1st apartment from south at westNot complied with
Aug 13, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt c4, 4th story, 2nd apartment from south at westNot complied with
Jun 03, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the 3rd room from east, the foyer , the private hallway , the 1st room from east located at apt a1, 2nd story, 2nd apartment from north at eastNot complied with
Jun 03, 2019§ 27-2005 adm code properly repair with similar material the broken or defective vinil tiles at floor in the 3rd room from east located at apt a1, 2nd story, 2nd apartment from north at eastNot complied with
Apr 27, 2019§ 27-2005 adm code paint metal in accordance with dept. regulation the steam pipe riser in the kitchen located at apt b5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Apr 27, 2019§ 27-2005 adm code paint metal in accordance with dept. regulation the steam pipe riser in the bathroom located at apt b5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Feb 25, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the private hallway , the bathroom , the kitchen , the 3rd room from east located at apt b1, 3rd story, 2nd apartment from north at eastNot complied with
Apr 26, 2018§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ;;; in the bathroom located at apt b5, 3rd story, 1st apartment from south at west , section at northFirst no access to re- inspect violation
Apr 23, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and east wall in the kitchen located at apt b5, 3rd story, 1st apartment from south at west , section at northFirst no access to re- inspect violation
Mar 20, 2018§ 27-2005 adm code refit the upper sash window in the bathroom located at apt d1, 5th story, 2nd apartment from north at eastNot complied with
Mar 08, 2018§ 27-2005 adm code properly repair the broken or defective bell and buzzer system located at apt b1, 3rd story, 2nd apartment from north at east , section at northNot complied with
Mar 08, 2018§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt b1, 3rd story, 2nd apartment from north at east , section at northNot complied with
Mar 08, 2018§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls in the 1st room from east located at apt b1, 3rd story, 2nd apartment from north at east , section at northNot complied with
Mar 08, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt b1, 3rd story, 2nd apartment from north at east , section at northNot complied with
May 22, 2017§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and walls in entire apartment in the entire apartment located at apt a5, 2nd story, 1st apartment from south at westFirst no access to re- inspect violation
May 22, 2017§ 27-2005 adm code properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom located at apt a5, 2nd story, 1st apartment from south at westFirst no access to re- inspect violation
Oct 22, 2016§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the 1st room from east, the private hallway , the foyer , the bathroom , the kitchen located at apt d9, 5th story, 2nd apartment from west at northNot complied with
Mar 11, 2016§ 27-2005 adm code replace with new the missing escutcheon plate in the bathroom located at apt c8, 4th story, 1st apartment from west at north , section at southFirst no access to re- inspect violation
Nov 22, 2015§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall and west wall in the kitchen located at apt 2, 1st story, 3rd apartment from south at westFirst no access to re- inspect violation
Oct 22, 2015§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at riser in the bathroom located at apt 2, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Jul 24, 2015§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt d10, 5th story, 1st apartment from south at westFirst no access to re- inspect violation

Property Owners and Associates

1133 Boston Post Road LLC
Owner, Corporate Owner
1.1(1)

2 Properties

87 Units

Duane Stephen
Site Manager
1.1(1)

1 Property

50 Units

Philip Schorr
Head Officer
1.4(2)

8 Properties

134 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

BASAMENT FLOOD FOR 2 YEARS BECAUSE PIPE BROKE
Former Tenant
Pros:
Landlord no fix water pipe (c) openigloo liking
Cons:
No heat No hot water Broke sewer (c) openigloo ...
Advice to owner:
PLEASE SELL YOUR BULDING TO SOMEONE ELSE