1161 Hoe Avenue,Bronx, NY 10459

9 Units

Built in 1925

5 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
153 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 144 violations which is 16 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
34Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
55Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
54Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Missing information/filings
1Class I
Missing or non-compliant with administrative information orders or filings
Learn More
Approval DateDescriptionCurrent Status
Apr 02, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 12, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sq ft at ceiling in the bathroom located at apt 9, 5th story, 1st apartment from south at westNotice of issuance sent to tenant
Mar 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the kitchen , the 5th room from east at north, the bathroom located at apt 9, 5th story, 1st apartment from south at westNov sent out
Dec 06, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 7 sq.ft the south wall and at ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Dec 06, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 7 sq.ft at ceiling and the south wall in the bathroom located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Dec 04, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at south wall (4 sq.ft.) in the bathroom located at apt 7, 4th story, 1st apartment from south at westFirst no access to re- inspect violation
Sep 21, 2023§ 27-2048 adm code paint or post a sign indicating floors at all stories at public hallNot complied with
May 23, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom located at apt 3, 2nd story, 1st apartment from south at westNot complied with
Mar 17, 2023(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Mar 15, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 3, 2nd story, 1st apartment from south at westNot complied with
Jan 17, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at bulkhead at public hall, 5th storyNot complied with
Nov 22, 2022§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st storyNot complied with
Nov 21, 2022§ 27-2005 adm code refit the east fire door at public hall, 1st storyNot complied with
Oct 13, 2022§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts and components at stacks at building front at fire escapeNot complied with
Sep 02, 2022§ 27-2005 adm code refit lower sash pane at window frame in the 1st room from east located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Sep 02, 2022§ 27-2005 adm code replace with new the broken or defective broken electric switch at east wall in the 5th room from east at north located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Sep 02, 2022§ 27-2005 adm code properly repair with similar material the broken or defective wood base sink cabinet in the kitchen located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Sep 01, 2022§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Aug 26, 2022§ 27-2005 adm code refit closet door in the 1st room from east at south located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Aug 09, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall and ceiling at public hall stairs, 1st storyNot complied with
Aug 08, 2022§ 27-2005 adm code refit door at entrance in the bathroom located at apt 3, 2nd story, 1st apartment from south at westNot complied with
Aug 08, 2022§ 27-2005 adm code properly repair with similar material the broken or defective wood base at sink cabinet in the kitchen located at apt 3, 2nd story, 1st apartment from south at westNot complied with
Jul 21, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall at public hall, 1st storyNot complied with
Apr 26, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall at public hall stairs, 1st storyNot complied with
Apr 26, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Apr 13, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall , intermediate landing at public hall stairs, 1st storyNot complied with
Apr 11, 2022§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missed at public hall, 1st storyNot complied with
Jan 12, 2022§ 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.Not complied with
Jul 27, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from east at south, the 1st room from east, the bathroom located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation
Apr 29, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east at south, the 1st room from east at north, the kitchen , the private hallway located at apt 2, 2nd story, 1st apartment from north at eastNot complied with
Apr 29, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 2, 2nd story, 1st apartment from north at eastNot complied with
Apr 26, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the kitchen , the bathroom located at apt 2, 2nd story, 1st apartment from north at eastNot complied with
Apr 02, 2021(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.First no access to re- inspect violation
Dec 26, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 5, 3rd story, 1st apartment from south at westFirst no access to re- inspect violation

Property Owners and Associates

Bethel Capital, LLC
Owner, Corporate Owner, Agent
0(0)

1 Property

9 Units

Yenny Castillo
Head Officer
0(0)

1 Property

9 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet