Feb 05, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 2nd story, 2nd apartment from north at eastCiv14 mailed
Feb 05, 2024§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 2d, 2nd story, 2nd apartment from north at eastCiv14 mailed
Feb 05, 2024§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom located at apt 2d, 2nd story, 2nd apartment from north at eastCiv14 mailed
Feb 05, 2024§ 27-2005 adm code properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 5c, 5th story, 1st apartment from north at eastNov certified on time
Feb 05, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, east wall and west wall at public hall, 5th storyNov sent out
Dec 02, 2023§ 27-2005 hmc: properly repair or replace the broken or defective escutcheon plate at steam riser ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at northNov sent out
Apr 28, 2023§ 27-2011 adm code cleanse to the satisfaction of this department the mold at grout and ceramic wall tiles at south wall in the bathroom located at apt 1d, 1st story, 2nd apartment from north at eastNov certified late
Apr 28, 2023§ 27-2005 hmc: properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 1d, 1st story, 2nd apartment from north at eastNov certified late
Apr 27, 2023§ 27-2005 adm code replace with new the missing door knob in the 1st room from east at north located at apt 1d, 1st story, 2nd apartment from north at eastNov certified late
Apr 27, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the foyer located at apt 1d, 1st story, 2nd apartment from north at eastNov certified late
Sep 24, 2019§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north, east and west walls at bulkhead , 5th storyNot complied with
Jul 31, 2018Section 27-2005 adm code replace with new the missing ceramic tile at the north wall in the bathroom located at apt 1d, 1st story, 1st apartment from north at eastInvalid certification
Feb 17, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 4th room from east at south, the kitchen , the bathroom located at apt 1b, 1st story, 1st apartment from east at southNov certified late
Jun 23, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north, the 1st room from east at south, the bathroom , the kitchen located at apt 1d, 1st story, 2nd apartment from north at eastNov certified late