1402 Clay Avenue,Bronx, NY 10456

29 Units

Built in 1914

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
93 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 88 violations which is 3.03 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
17Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
44Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
27Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Aug 11, 2023§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint the 1st and 2nd fire escape from north at building front exterior wall.Nov sent out
Apr 02, 2023Section 27-2005 adm code properly secure the loose escutcheon plate in the kitchen located at apt 4a, 4th story, 1st apartment from north at eastNov sent out
Apr 02, 2023Section 27-2005 adm code replace with new the broken or defective gas sket at refrigerator lower door in the kitchen located at apt 4a, 4th story, 1st apartment from north at eastNov sent out
Apr 02, 2023Section 27-2005 adm code properly repair the broken or defective light fixtures at ceiling in the foyer located at apt 4a, 4th story, 1st apartment from north at eastNov sent out
Apr 02, 2023Section 27-2005 adm code properly repair the broken or defective bell/buzzer and intercom at south wall in the foyer located at apt 4a, 4th story, 1st apartment from north at eastNov sent out
Apr 02, 2023Section 27-2005 adm code properly secure the loose faucet at washbasin in the bathroom located at apt 4a, 4th story, 1st apartment from north at eastNov sent out
Oct 16, 2021Section 27-2005 adm code properly repair with similar material the broken or defective vynil floor tiles in the private hallway located at apt 4a, 4th story, 1st apartment from north at eastNov sent out
Oct 16, 2021Section 27-2005 adm code refit door to apartment in the entrance located at apt 4a, 4th story, 1st apartment from north at eastNov sent out
Oct 16, 2021Section 27-2005 adm code properly secure the loose door knob to apartment in the entrance located at apt 4a, 4th story, 1st apartment from north at eastNov sent out
Jun 17, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all fire retardant ceilings, walls, doors and trim at all stories at public hallNov sent out
Jun 17, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the floors and stairs at all stories at public hallNov sent out
Apr 12, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall at vestibule , 1st storyNov sent out
Mar 04, 2021Section 27-2011 adm code cleanse to the satisfaction of this department the floors, stairs and stair landings at all storiesNov sent out
Jan 10, 2020Section 27-2005 adm code properly repair the broken or defective inoperative bell and buzer system from the first storypublic hall vestibule to 5th story apt 5d in the foyer located at apt 5d, 5th story, 1st apartment from south at westNov sent out
Dec 17, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom , the kitchen , the 3rd room from east at south, the 3rd room from east at north, the 4th room from east located at apt 4c, 4th story, 2nd apartment from east at southNot complied with
Feb 20, 2018Section 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at north wall , roof bulk headNov sent out
Feb 20, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall , roof bulk headNov sent out

Property Owners and Associates

1402 Realty Inc.
Agent, Corporate Owner
2.5(1)

2 Properties

35 Units

Louis Calos
Site Manager, Head Officer
1.9(2)

5 Properties

151 Units

Therison Realty Inc
Agent, Corporate Owner
1.9(2)

6 Properties

157 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

okay cool sweet
Former Tenant
Pros:
I was close to everything (c) openigloo
Cons:
a mouse / rat problem (c) openigloo never check...
Advice to owner:
you should do and yearly renovations to tenants...