2408 Webster Avenue,Bronx, NY 10458

8 Units

Built in 1909

4 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
66 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 118 violations which is 14.75 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
17Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
61Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
40Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 21, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 8 sq ft at ceiling in the bathroom located at apt 2s, 3rd story, 2nd apartment from north at eastNotice of issuance sent to tenant
Jan 05, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Dec 27, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 7th room from east at north located at apt 3n, 3rd story, 1st apartment from north at eastNot complied with
Aug 19, 2021Section 27-2005 adm code refit lower sash of 2nd window from east at south wall in the 4th room from east located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Jul 28, 2021Section 27-2005 adm code properly repair with similar material the broken or defective the wood trim casing at door frame in the 2nd bathroom from east at south located at apt 3s, 3rd story, 3rd apartment from north at eastNov sent out
Jul 28, 2021Section 27-2005 adm code replace with new the missing upper and lower escucheon plate at riser in the 2nd room from east located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Jul 28, 2021Section 27-2005 adm code properly repair the broken or defective electric outlet at north wall in the 2nd room from east located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Jul 25, 2021Section 27-2005 adm code refit upper sash window in the 4th room from east located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Jul 25, 2021Section 27-2005 adm code replace with new the broken or defective glass at lower sash window in the kitchen located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
May 14, 2021Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 3s, 3rd story, 1st apartment from east at southNov sent out
Jan 29, 2021Section 27-2005 adm code properly repair the broken or defective door frame in the 5th room from east located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Jan 29, 2021Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ;; in the bathroom located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Jan 29, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Jan 29, 2021Section 27-2005 adm code properly secure the loose electrical outlet at north wall in the 5th room from east located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Jan 29, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak concealed water leak at ceiling in the bathroom located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Jan 29, 2021Section 27-2005 adm code properly repair the broken or defective door frame in the entrance located at apt 3s, 3rd story, 2nd apartment from north at eastNov sent out
Dec 08, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling at bulk headNot complied with

Property Owners and Associates

73rd Partners LLC
Owner, Corporate Owner
3(9)

11 Properties

77 Units

Isaac Oved
Head Officer
2.1(1)

2 Properties

16 Units

Joseph Safdie
Site Manager
2.1(1)

1 Property

8 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Management Sucks Then Tried to switch management to cover up
Former Tenant
Pros:
Have dishwasher /microwave
Cons:
Mold mildew,floors Is Damaged as (c) openigloo ...
Advice to owner:
Fix intercom Repairs entire building