Mar 13, 2024§ 27-2011 adm code cleanse to the satisfaction of this department the the floor at year yardNov sent out
Mar 05, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4 sq ft at window frame at north wall approximately 4 sq ft at window frame at east wall in the 1st room from north located at apt 4a, 6th story, 2nd apartment from west at northNotice of issuance sent to tenant
Mar 05, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4 sq ft at window frame at east wall in the 2nd room from north located at apt 4a, 6th story, 2nd apartment from west at northNotice of issuance sent to tenant
Mar 04, 2024§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , frame too high ( approx. 71 inches from floor) , 1st storyNov sent out
Feb 28, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2 sqft at ceiling and approximately 2sqft west wall in the bathroom located at apt d, 2nd story, 1st apartment from east at southNotice of issuance sent to tenant
Feb 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall, north wall, south wall in the bathroom located at apt d, 2nd story, 1st apartment from east at southNov sent out
Feb 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt d, 2nd story, 1st apartment from east at southNov sent out
Feb 15, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from north at east wall in the bathroom located at apt d, 2nd story, 1st apartment from east at southNov sent out
Feb 15, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door from west at north wall in the foyer located at apt d, 2nd story, 1st apartment from east at southNov sent out
Feb 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall in the foyer located at apt d, 2nd story, 1st apartment from east at southNov sent out
Feb 15, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall in the 2nd room from north at east located at apt d, 2nd story, 1st apartment from east at southNov sent out
Jan 03, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 8 sq ft at 1st window frame from south at west wall in the bathroom located at apt d, 2nd story, 1st apartment from east at southNotice of issuance sent to tenant
Sep 10, 2018§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration stud and sheetrock wall erected from floor to ceiling creating additional room in the 1st room from north at east located at apt 2d, 3rd story, 1st apartment from south at westNot complied with
Sep 10, 2018§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration stud and sheetrock wall erected from floor to ceiling creating additional room in the 1st room from east located at apt 4a, 6th story, 2nd apartment from west at northNot complied with