2471 Beaumont Avenue,Bronx, NY 10458

34 Units

Built in 1913

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
213 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 114 violations which is 3.35 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
15Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
49Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
50Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 02, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Mar 20, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx. 3 sq. ft. at ceiling, 1 sq. ft. at west wall and 1 sq. ft. at east wall. in the bathroom located at apt 5d, 5th story, 2nd apartment from north at eastNotice of issuance sent to tenant
Mar 20, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at the ceiling at 1st public hall bulkhead from north, 5th storyNov sent out
Feb 08, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at bulkhead ceiling 5th story roofNov sent out
Jan 17, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2sqft at the ceiling in the bathroom located at apt 5d, 5th story, 2nd apartment from north at eastNotice of issuance sent to tenant
Jan 17, 2024§ 27-2011 adm code cleanse to the satisfaction of this department the public hallway, and public hall stairs at all stories throughout at public hallNov sent out
Jan 17, 2024§ 27-2022 adm code post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hallNov sent out
Jan 05, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom located at apt 1e, 1st story, 1st apartment from south at westCiv14 mailed
Jan 05, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door from north at east wall in the foyer located at apt 1e, 1st story, 1st apartment from south at westCiv14 mailed
Jan 05, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 1e, 1st story, 1st apartment from south at westCiv14 mailed
Jan 05, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the 1st room from east located at apt 1e, 1st story, 1st apartment from south at westCiv14 mailed
Nov 26, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sqft at ceiling, east wall and window casing in the bathroom located at apt 3c, 3rd story, 3rd apartment from north at eastCiv14 mailed
Aug 11, 2022§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings, walls, doors and trim in the entire apartment located at apt 3c, 3rd story, 3rd apartment from north at eastNot complied with
Aug 11, 2022§ 27-2005 adm code properly repair the broken or defective entrance door in the 1st room from east located at apt 3c, 3rd story, 3rd apartment from north at eastNot complied with
Nov 18, 2019§ 27-2005 adm code paint metal in accordance with dept. regulation steam riser at west wall in the bathroom located at apt 4c, 4th story, 3rd apartment from north at eastFirst no access to re- inspect violation

Property Owners and Associates

690 East 189th LLC
Owner
2.1(1)

1 Property

34 Units

690 East 189th St LLC
Corporate Owner
2.1(1)

2 Properties

40 Units

Icer Of 444 Ralph Avenue LLC
Corporate Owner
2.7(36)

77 Properties

836 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Don’t move here
Former Tenant
Pros:
- really cheap
Cons:
- walk up - monthly exterminator (c) openigloo ...