2116 Crotona Parkway,Bronx, NY 10460

22 Units

Built in 1931

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
143 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 267 violations which is 12.13 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
53Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
170Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
44Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 23, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 4 sq feet at window trim at south wall in the bathroom located at apt 4b, 5th story, 1st apartment from south at westNotice of issuance sent to tenant
Apr 23, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation the radiator at south wall in the 2nd room from north located at apt 3b, 4th story, 1st apartment from south at westNov sent out
Apr 03, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 1st room from east at north located at apt 2b, 3rd story, 1st apartment from east at southNov sent out
Mar 28, 2024§ 27-2005 hmc: properly repair or replace the broken or defective electrical outlet at south wall in the 2nd room from east at south located at apt 2b, 3rd story, 1st apartment from east at southNov sent out
Mar 13, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx.3 sq ftat ceiling in the bathroom located at apt d, 1st story, 2nd apartment from south at westNotice of issuance sent to tenant
Feb 17, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... aprrox 6 sqft at ceiling in the 1st room from east at south located at apt 1b, 2nd story, 1st apartment from east at southNotice of issuance sent to tenant
Feb 17, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, windows, trims and doors in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at southNov sent out
Feb 04, 2024§ 27-2005 hmc: properly repair or replace the broken or defective shower head in the bathroom located at apt 2b, 3rd story, 1st apartment from east at southNov sent out
Feb 03, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... (approximately 3 sq.ft) at the ceiling in the 1st room from north at east located at apt 2b, 3rd story, 1st apartment from east at southNotice of issuance sent to tenant
Feb 03, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north at east located at apt 2b, 3rd story, 1st apartment from east at southNov sent out
Feb 03, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 3rd room from north at east located at apt 2b, 3rd story, 1st apartment from east at southNov sent out
Feb 03, 2024§ 27-2005 hmc: properly repair or replace the broken or defective spring balance at lower sash east 2 window in the 1st room from north at east located at apt 2b, 3rd story, 1st apartment from east at southNov sent out
Jan 24, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 4b, 5th story, 1st apartment from east at southNov sent out
Jan 24, 2024§ 27-2005 hmc: refit spring counter balance at lower window sash at east wall in the 1st room from east at south located at apt 4b, 5th story, 1st apartment from east at southNov sent out
Oct 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th storyNov sent out
Oct 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls and ceiling at bulkhead.Nov sent out
Oct 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 2nd room from east, the 1st room from east at south, the bathroom located at apt 4b, 5th story, 1st apartment from east at southNov sent out
Jul 14, 2023§ 27-2005 adm code properly secure the loose loose escutcheon at ceiling at heat riser in the bathroom located at apt 1a, 2nd story, 1st apartment from north at eastNov sent out
Jul 14, 2023§ 27-2005 adm code provide escutcheon plate at ceiling at heat riser in the 1st room from east at north located at apt 1a, 2nd story, 1st apartment from north at eastNov sent out
Jul 08, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt d, 1st story, 2nd apartment from north at eastNov sent out
Jul 08, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt d, 1st story, 2nd apartment from north at eastNov sent out
May 06, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 1st room from north at east, the bathroom , the kitchen located at apt 3c, 4th story, 1st apartment from south at westNov sent out
Feb 27, 2023Section 27-2005 adm code refit lower sash window at south wall in the 1st room from east at south located at apt 2b, 3rd story, 1st apartment from east at southNov sent out
Feb 27, 2023Section 27-2005 adm code refit entrance door in the entrance located at apt 2b, 3rd story, 1st apartment from east at southNov sent out
Dec 27, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation door in the entrance located at apt 3b, 4th story, 1st apartment from east at southNov sent out
Dec 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 1c, 2nd story, 1st apartment from south at westNov sent out
Dec 27, 2022Section 27-2005 adm code replace with new the broken or defective upper window sash counter balance at west wall in the 3rd room from north located at apt 1c, 2nd story, 1st apartment from south at westNov sent out
Dec 27, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceilng in the 2nd room from north located at apt 1c, 2nd story, 1st apartment from south at westNov sent out
Dec 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th storyNov sent out
Dec 27, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls at bulkheadNov sent out
Dec 27, 2022Section 27-2053 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 2nd storyNov sent out
Jul 08, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 1b, 2nd story, 1st apartment from east at southNov sent out
Jul 08, 2022Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling and walls in the 2nd room from east at south located at apt 1b, 2nd story, 1st apartment from east at southNov sent out
Jul 08, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings and all walls in the entire apartment located at apt 1b, 2nd story, 1st apartment from east at southNov sent out
Jun 01, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling. in the bathroom located at bsmt-apt lw, 1st bsmt-apt from north at eastNov sent out
May 05, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and all walls in the 1st private hallway from north located at bsmt-apt nw, 1st bsmt-apt from north at eastNov sent out
May 05, 2022Section 27-2011 adm code cleanse to the satisfaction of this department the mold at ceramic tiles at south, north and west wall in the bathroom located at bsmt-apt nw, 1st bsmt-apt from north at eastNov sent out
May 05, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation pipe at ceiling in the bathroom located at bsmt-apt nw, 1st bsmt-apt from north at eastNov sent out
Apr 21, 2022Section 27-2005 adm code replace with new the broken or defective entrance door in the 1st room from north located at apt b, 1st story, 2nd apartment from north at eastNov sent out
Apr 21, 2022Section 27-2005 adm code properly repair the broken or defective entrance door in the bathroom located at apt b, 1st story, 2nd apartment from north at eastNov sent out
Apr 21, 2022Section 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt b, 1st story, 2nd apartment from north at eastNov sent out
Dec 07, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from north at eastNov sent out
Oct 05, 2021Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 2nd story, 1st apartment from north at eastNov sent out
Nov 09, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and walls in the entire apartment located at apt a, 1st story, 1st apartment from north at eastNov sent out
Jul 27, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and east wall in the kitchen located at apt 4d, 4th story, 2nd apartment from west at northNov sent out
Jul 05, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls at bulkhead , 5th storyNot complied with
Jul 05, 2017Section 27-2005 adm code properly repair with similar material the broken or defective window stool with fire retardant material , 5th storyNot complied with
Jul 05, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department window stool , 5th storyNot complied with
May 10, 2017Section 27-2005 adm code properly repair with similar material the broken or defective bulkhead walls with fire retartant materials , 5th storyNot complied with
Sep 19, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department ceiling and walls in the entire apartment located at apt nwi, 1st story, apartment at northFirst no access to re- inspect violation
May 31, 2016Section 27-2026 adm code repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 4a, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
May 31, 2016Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at north and west walls in the bathroom located at apt 4a, 5th story, 1st apartment from north at eastFirst no access to re- inspect violation
Apr 05, 2016Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at west, the bathroom located at apt d, 1st story, 2nd apartment from south at westNot complied with

Property Owners and Associates

Aquinas Apartments LP
Corporate Owner
1.7(5)

41 Properties

925 Units

Crotona Parkway Apartments Housing Dev F Und Corp
Owner
1(1)

1 Property

22 Units

Crotona Pkwy Apts Hdfc
Corporate Owner
1(1)

2 Properties

31 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

This is the Worse building in the Bronx
Former Tenant
Pros:
I do not like anything
Cons:
I do not like this (c) openigloo building becau...