2175 Ryer Avenue,Bronx, NY 10457

56 Units

Built in 1939

6 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
71 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 55 violations which is 0.98 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
15Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
23Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
17Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 17, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Feb 18, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jun 28, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the private hallway located at apt 1c, 1st story, 1st apartment from south at westNov sent out
Dec 18, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 5th room from east, the 1st room from east, the foyer , the 4th room from east, the private hallway located at apt 1j, 1st story, 1st apartment from north at eastNov sent out
Nov 30, 2019Section 27-2005 adm code paint metal in accordance with dept. regulation at radiator cover in the 4th room from east at north located at apt 1e, 1st story, 3rd apartment from south at westFirst no access to re- inspect violation
Nov 30, 2019Section 27-2005 adm code paint metal in accordance with dept. regulation at radiator cover in the 1st room from east at south located at apt 1e, 1st story, 3rd apartment from south at westFirst no access to re- inspect violation
Oct 25, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls and ceiling in the kitchen located at apt 1g, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
Oct 25, 2019Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood studs and sheetrock wall erected from floor to ceiling in the 4th room from east located at apt 4c, 4th story, 1st apartment from south at westNov sent out
Oct 24, 2019Section 27-2005 adm code replace with new the missing handles on base cabinet at sink in the kitchen located at apt 1g, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
Sep 18, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the walls in the kitchen located at apt 1g, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
Aug 17, 2019Section 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles around toilet in the bathroom located at apt 1g, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
Apr 01, 2019Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration stud and sheetrock wall erected from floor to ceiling, subdividing room in two or creating additional rooms in the entire apartment located at apt 3g, 3rd story, 1st apartment from west at northNot complied with
Apr 25, 2018Section 27-2041 adm code provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door is missing in the entrance located at apt 2a, 2nd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Apr 25, 2018Section 27-2005 hmc:trace and repair the source and abate the nuisance consisting of mold ... approx. 4 sq. ft of mold at ceiling and west wall in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at eastFirst no access to re- inspect violation
Apr 25, 2018Section 27-2005 adm code properly repair with similar material the broken or defective wooden door at base cabinet in the kitchen located at apt 2a, 2nd story, 2nd apartment from north at eastFirst no access to re- inspect violation

Property Owners and Associates

2175 Ryer Ave Corp
Agent, Corporate Owner
2.3(1)

1 Property

56 Units

Edin Kolenovic
Site Manager
2.3(1)

1 Property

56 Units

Kima Kolenovic
Shareholder
2.3(1)

1 Property

56 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Bad not good elevator is always braking
Former Tenant
Pros:
There are no pros
Cons:
The building has alot of (c) openigloo mold the...
Advice to owner:
Do better with getting repairs done in your apa...