2078 Morris Avenue,Bronx, NY 10453

72 Units

Built in 1926

5 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
287 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 53 violations which is 0.73 violations per unit for their entire portfolio.
That is better than the city average, which is 0.81 violations per unit.
Non-hazardous
8Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
33Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
12Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 07, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at west wall fire retardant material at public hall, 1st storyNov sent out
Jan 03, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation steam riser in the bathroom located at apt 4a, 4th story, 2nd apartment from south at westNov sent out
Feb 28, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at west wall ( apprx. 4 sq.ft.) at public hall, 1st story, section ''2090''First no access to re- inspect violation
Nov 21, 2021Section 27-2005 adm code replace with new the broken or defective escutheon plate at steam riser in the bathroom located at apt 3d, 3rd story, 1st apartment from east at southNov sent out
Apr 14, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the foyer located at apt 3n, 3rd story, 1st apartment from south at westNot complied with
Mar 28, 2019Section 27-2005 adm code refit wood door in the 1st closet at north in the private hallway located at apt 1b, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Mar 28, 2019Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the foyer , the private hallway , the bathroom , the 4th room from east at south, the 3rd room from east, the kitchen located at apt 1b, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Jul 19, 2018Section 27-2005 adm code properly repair the broken or defective door in the 4th room from east at south located at apt 3a, 3rd story, 2nd apartment from south at westNot complied with

Property Owners and Associates

Andrew Kleiman
Site Manager
0(0)

2 Properties

120 Units

Joseph Zitolo
Head Officer
2.9(33)

182 Properties

4812 Units

Lemle Realty Corp
Corporate Owner
3.6(2)

7 Properties

278 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet