5 North Street,Bronx, NY 10468

2 Units

Built in 1920

3 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
32 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 85 violations which is 42.5 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
14Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
38Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
33Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 15, 2022Section 27-2023 admin. code: provide place within the building for the storage of waste receptacles and disinfect same regularly.Nov sent out
Apr 15, 2022Section 27-2005 admin. code: replace with new the broken or defective rubber gasket at bottom door of refrigerator in the kitchen located at apt 2f, 2nd story, 1st apartment from east at southNov sent out
Apr 15, 2022Section 27-2026 admin. code: reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2f, 2nd story, 1st apartment from east at southNov sent out
Mar 16, 2022Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at eastNov sent out
Dec 08, 2021Section 27-2026 admin. code: reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2f, 2nd story, 1st apartment from east at southNov sent out
Nov 24, 2021Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Nov 24, 2021Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st storyNov sent out
Nov 24, 2021Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st storyNov sent out
Nov 24, 2021Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Nov sent out
Nov 13, 2021Section 27-2005 adm code replace with new the missing electrical cover plate at wall switch at north wall in the 2nd room from east located at apt 3, 3rd story, 1st apartment from north at eastNov sent out
Nov 13, 2021Section 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st storyNov sent out
Nov 13, 2021Section 27-2045 adm code post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. , 1st storyNov sent out
Nov 13, 2021Section 27-2046.1 hmc: post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.Nov sent out
Nov 13, 2021Section 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st storyNov sent out

Property Owners and Associates

Benjamin Azizian
Officer
0(0)

1 Property

2 Units

Hooshang Monsef
Site Manager, Head Officer
0(0)

1 Property

2 Units

Shepesh, Inc
Owner, Corporate Owner, Agent
0(0)

2 Properties

6 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet