2487 Grand Avenue,Bronx, NY 10468

41 Units

Built in 1920

5 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
237 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 181 violations which is 4.41 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
40Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
86Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
55Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 16, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th storyNov sent out
Apr 12, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer , the 4th room from east at south located at apt e1, 5th story, 2nd apartment from south at westNov sent out
Apr 05, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from east at north located at apt e1, 5th story, 2nd apartment from south at west , section ''north''Nov sent out
Apr 05, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling ( approx 3 sqft) in the private hallway located at apt e1, 5th story, 2nd apartment from south at west , section ''north''Notice of issuance sent to tenant
Apr 05, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at window casing at north 1 window ( approx 6 sqft) in the bathroom located at apt e1, 5th story, 2nd apartment from south at west , section ''north''Notice of issuance sent to tenant
Apr 05, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at ceiling ( approx 2 sqft) in the bathroom located at apt e1, 5th story, 2nd apartment from south at west , section ''north''Notice of issuance sent to tenant
Apr 05, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... at window casing at west 2 window ( approx. 4 sqft) in the 4th room from east at north located at apt e1, 5th story, 2nd apartment from south at west , section ''north''Notice of issuance sent to tenant
Apr 05, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story [ section at north]Nov sent out
Jan 31, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department walls and ceiling, in the entire apartment located at apt c4, 3rd story, 1st apartment from north at east , section at northNov sent out
Dec 28, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximatley 4 sq. ft. at ceiling, west wall and baseboard at west wall in the foyer located at bsmt-apt baseme, 1st bsmt-apt from south at westNotice of issuance sent to tenant
Dec 28, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4 sq. ft. at ceiling, south wall and east wall in the 1st room from east at south located at bsmt-apt baseme, 1st bsmt-apt from south at westNotice of issuance sent to tenant
Dec 28, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 1st room from east at south, the 1st room from east at north, the bathroom , the 3rd room from east located at bsmt-apt baseme, 1st bsmt-apt from south at westNov sent out
Sep 13, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at east wall at public hall stairs, 1st story, section at southSecond no access to re-inspect violation
Jul 26, 2023§ 27-2005 adm code replace with standard wire glass the present glass at lower window sash at intermidiate landing at public hall stairs, 1st story, section at southSecond no access to re-inspect violation
Jul 24, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department fire retardant ceiling and all walls in vestiuble at public hall, 1st storySecond no access to re-inspect violation
Jul 24, 2023§ 27-2011 adm code cleanse to the satisfaction of this department the floors, stair landings & stairs , at all stories , at public hallSecond no access to re-inspect violation
Jul 24, 2023§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant ceiling all walls in vestiuble. at public hall, 1st storySecond no access to re-inspect violation
Jul 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 5th story, section ''north''Second no access to re-inspect violation
Jul 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall and south wall at public hall, 5th story, section ''south ''Second no access to re-inspect violation
Jul 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at the north wall at public hall stairs, 3rd story, section ''north''Second no access to re-inspect violation
Jul 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall at public hall, 3rd story, section ''south''Second no access to re-inspect violation
Jun 19, 2023§ 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl , in the bathroom located at apt 6b, 2nd story, 2nd apartment from north at east , section at southNov sent out
Jan 17, 2023Section 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 4th room from east at south located at apt b3, 2nd story, 2nd apartment from north at east , section ''2487'', 1st from west at northNov sent out
Jan 13, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling , 1st storySecond no access to re-inspect violation
Mar 08, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at north wall in the 1st room from north at west located at apt e7, 5th story, 2nd apartment from east at southNov sent out
Mar 03, 2022Section 27-2005 adm code replace with new the missing escutcheon plate at heat riser at east wall in the 1st room from east at south located at apt 6c, 3rd story, 2nd apartment from north at east , section at southNov sent out
Jan 24, 2022Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt apte1, 5th story, 2nd apartment from south at westNov sent out
Nov 29, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 4th room from east at north located at apt 1a, 1st story, 4th apartment from south at westNot complied with
Nov 08, 2021§ 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at bldg entrance at fire escapeSecond no access to re-inspect violation
Nov 01, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt c4, 3rd story, 1st apartment from north at eastSecond no access to re-inspect violation
Nov 01, 2021§ 27-2005 adm code properly repair with similar material the broken or defective fire retardant material at ceiling at vestibule , 1st storySecond no access to re-inspect violation
Nov 01, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling at vestibule , 1st storySecond no access to re-inspect violation
Aug 20, 2021Section 27-2005 adm code refit wooden door in the 1st room from east located at apt b3, 2nd story, 3rd apartment from north at east , section at northNot complied with
Aug 20, 2021Section 27-2005 adm code refit 1st and 2nd closet doors from west at north in the 1st room from east located at apt b3, 2nd story, 3rd apartment from north at east , section at northNot complied with
Jun 16, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at all walls and ceiling in the 4th room from east at north located at apt 1a, 1st story, 4th apartment from south at westNot complied with
Jun 16, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt 1a, 1st story, 4th apartment from south at westNot complied with
Jun 16, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at south located at apt 1a, 1st story, 4th apartment from south at westNot complied with
Jun 16, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at vestibule ceiling , 1st storySecond no access to re-inspect violation
May 11, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt b1, 2nd story, 2nd apartment from south at west , section at northNot complied with
Apr 12, 2019Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration lower than 8ft ceiling with sheetrock in the bathroom located at apt 1a, 1st story, 4th apartment from south at westNot complied with

Property Owners and Associates

Barry Singer
Head Officer
1.5(6)

16 Properties

427 Units

Daniel Caller
Site Manager, Agent
0(0)

1 Property

41 Units

Mgsa Vii LLC
Owner, Corporate Owner
2.9(1)

2 Properties

59 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet