Sep 28, 2023§ 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 4e, 4th story, 2nd apartment from south at westNov sent out
Jul 31, 2023§ 27-2005 hmc: refit door leading from center section to south section at public hall, 6th story, section at southNov certified on time
Jul 31, 2023§ 27-2011 adm code cleanse to the satisfaction of this department the all metal treads, bannisters and landings leading from public hall 1st floor to west yard. at public hall stairs, section at southNov certified on time
Jul 03, 2023§ 27-2011 adm code cleanse to the satisfaction of this department the at building front courtyardNov certified on time
Apr 03, 2023Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 4e, 4th storyNov sent out
Oct 04, 2022Section 27-2005 adm code refit the door leading from street to basement area at south front inner court of building (door does not align with frame)Nov sent out
Jun 02, 2022Section 27-2014 adm code and dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint the fire escapes, at rear yardNot complied with
Sep 08, 2018Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1h, 1st story, 2nd apartment from north at eastNot complied with
Sep 05, 2018Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from west at north wall, 1st radiator from west at north wall in the 1st room from east located at apt 1h, 1st story, 2nd apartment from north at eastNot complied with
Sep 05, 2018Section 27-2005 adm code paint metal in accordance with dept. regulation the 1st radiator from west at north wall, 1st riser from west at north wall in the 3rd room from east located at apt 1h, 1st story, 2nd apartment from north at eastNot complied with
Aug 17, 2018Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1h, 1st story, 2nd apartment from east at southNot complied with
Aug 29, 2013Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition erected creating a room consisting of wood studs and sheetrock in the 4th room from east located at apt 3a, 3rd story, 5th apartment from north at eastNot complied with