2757 Claflin Avenue,Bronx, NY 10468

83 Units

Built in 1927

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
406 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 88 violations which is 1.06 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
32Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
39Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
17Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 21, 2024§ 27-2005 adm code paint metal in accordance with dept. regulation steam riser in the bathroom located at apt 1l, 1st story, 1st apartment from north at eastNov sent out
Apr 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 6d, 6th story, 1st section from east at southNov sent out
Apr 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the kitchen located at apt 6d, 6th story, 1st section from east at southNov sent out
Mar 18, 2024§ 27-2005 adm code properly repair with similar material the broken or defective caulking at ceramic tiles at bathtub area in the bathroom located at apt 4j, 4th story, 2nd apartment from west at northCiv14 mailed
Mar 18, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the kitchen located at apt 4j, 4th story, 2nd apartment from west at northNov sent out
Mar 18, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 4j, 4th story, 2nd apartment from west at northNov sent out
Feb 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 1st storyNov certified on time
Dec 26, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the south wall in the foyer located at apt 5e, 5th story, 2nd apartment from east at southCiv14 mailed
Dec 16, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 1st room from east at south located at apt 6n, 6th story, 2nd apartment from north at east , section ''center''Civ14 mailed
Dec 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall in the foyer located at apt 5e, 5th story, 2nd apartment from east at southCiv14 mailed
Dec 04, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from north at east wall in the bathroom located at apt 5e, 5th story, 2nd apartment from east at southCiv14 mailed
Dec 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the west wall in the 4th room from east at north located at apt 5e, 5th story, 2nd apartment from east at southCiv14 mailed
Dec 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the 4th room from east at south located at apt 5e, 5th story, 2nd apartment from east at southCiv14 mailed
Dec 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the east wall in the bathroom located at apt 5e, 5th story, 2nd apartment from east at southCiv14 mailed
Dec 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the sill at the south 1 window frame in the 1st room from east located at apt 5e, 5th story, 2nd apartment from east at southCiv14 mailed
Oct 06, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from east located at apt 5k, 5th story, 1st apartment from west at northNov sent out
Jul 22, 2023§ 27-2005 hmc: properly repair or replace the broken or defective return buzzer from building entrance to apt at west wall in the kitchen located at apt 5n, 5th story, 3rd apartment from north at eastInvalid certification
Apr 21, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all ceilings, walls and trim in the entire apartment located at apt 6c, 6th story, 7th apartment from north at eastNov sent out
Aug 02, 2021Section 27-2005 adm code replace with new the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 6d, 6th story, 1st apartment from east at southNot complied with
Sep 17, 2019Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration full wall erected from wall to ceiling creating additional room in the 1st room from north located at apt 5i, 5th story, 1st apartment from south at westNot complied with
Jan 10, 2019Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partition wall erected to subdivide the room in the 3rd room from east at south located at apt 6h, 6th story, 3rd apartment from south at westNot complied with
Dec 17, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall, south wall in the 1st room from east at north located at apt 5d, 5th story, 1st apartment from east at southNot complied with
Dec 17, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the north wall, south wall in the 1st room from east at south located at apt 5d, 5th story, 1st apartment from east at southNot complied with
Oct 04, 2018Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of partition wall from floor to ceiling sub dividing room. in the 3rd room from east at south located at apt 6h, 6th story, 3rd apartment from south at westNot complied with
Aug 21, 2018Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wall erected subdivinding a room using sheetrock and stud in the 1st room from east at north located at apt 3a, 3rd story, 5th apartment from north at eastNot complied with
Aug 20, 2018Section 27-2005 adm code replace with new the broken or defective vinyl floor covering in the 2nd private hallway from east located at apt 5d, 5th story, 1st apartment from east at southNot complied with
Aug 20, 2018Section 27-2005 adm code replace with new the broken or defective vinyl floor covering in the 1st private hallway from east located at apt 5d, 5th story, 1st apartment from east at southNot complied with
Feb 23, 2018Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 4d, 4th story, 1st apartment from east at southNot complied with
Sep 22, 2017Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls & ceilings in the entire apartment located at apt 4d, 4th story, 1st apartment from south at west , section ''west''Not complied with
Nov 18, 2016Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration parttion wall erected from floor to ceiling dividing room in two in the 1st room from north at west located at apt 5i, 5th story, 1st apartment from west at northNot complied with
Jul 10, 2016Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock and wooden studs wall erected from floor to ceiling creating an additional room in the 1st room from east at north located at apt 3a, 3rd story, 5th apartment from north at eastNot complied with
Jan 14, 2015Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration errected wall in the 3rd room from east at south located at apt 6h, 6th story, 3rd apartment from south at westNot complied with

Property Owners and Associates

2020 Realty Holdings
Corporate Owner
2.1(16)

59 Properties

2839 Units

Claflin Apartments LLC
Corporate Owner
0(0)

2 Properties

125 Units

Moshe Piller
Site Manager, Agent, Head Officer
2.2(15)

54 Properties

2566 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet