Dec 07, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st storyViolation open
Dec 03, 2023§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at ..... at public hall, 1st storyNov sent out
Dec 03, 2023§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Dec 03, 2023§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Oct 25, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from east at north, the kitchenette , the 2nd room from east, the 3rd room from east, the private hallway located at bsmt-apt 3rr, 1st bsmt-apt from north at eastNov sent out
Oct 24, 2023§ 27-2026 adm code repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at bsmt-apt 3rr, 1st bsmt-apt from north at eastNov sent out
Oct 24, 2023§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the 4th room from east at north located at bsmt-apt 3rr, 1st bsmt-apt from north at eastNov sent out
Oct 24, 2023§ 27-2005 hmc: properly repair or replace the broken or defective intercom system box at south wall in the private hallway located at bsmt-apt 3rr, 1st bsmt-apt from north at eastNov sent out