1816 White Plains Road,Bronx, NY 10462

61 Units

Built in 1928

5 Floors

lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
134 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 83 violations which is 1.36 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
19Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
54Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
10Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Mar 28, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 5 sq ft at east wall in the 1st room from north located at apt 5a, 5th story, 1st apartment from north at eastNotice of issuance sent to tenant
Mar 28, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 5 sq ft at north wall in the 1st room from north located at apt 5a, 5th story, 1st apartment from north at eastNotice of issuance sent to tenant
Mar 28, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 5 sq ft at ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from north at eastNotice of issuance sent to tenant
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st window frame from west at north wall in the 3rd room from east located at apt 5a, 5th story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at 1st door frame from north at east wall, 2nd window frame from west at north wall in the 3rd room from east located at apt 5a, 5th story, 1st apartment from north at eastNov sent out
Mar 28, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 5 sq ft at 1st window frame from west at north wall in the kitchen located at apt 5a, 5th story, 1st apartment from north at eastNotice of issuance sent to tenant
Mar 28, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 5 sq ft at north wall in the kitchen located at apt 5a, 5th story, 1st apartment from north at eastNotice of issuance sent to tenant
Mar 28, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 1st room from north located at apt 5a, 5th story, 1st apartment from north at eastNov sent out
Mar 24, 2024§ 27-2005 adm code properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2k, 2nd story, 2nd apartment from south at west , section at northNov sent out
Mar 24, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of dry wall partition erected from floor to ceiling creating additional room and reducing natural light and ventilation in the kitchen located at apt 2k, 2nd story, 2nd apartment from south at west , section at northNov sent out
Mar 24, 2024§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2k, 2nd story, 2nd apartment from south at west , section at northCiv14 mailed
Feb 18, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approx 1 sq ft at north wall, 3 sq ft at west wall around window frame in the 4th room from north at west located at apt 4f, 4th story, 1st apartment from west at north , section ''south''Civ14 mailed
Feb 18, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration storage enclosure created with metal gate installed under stairway soffit at south section at public hall, 1st storyNov sent out
Feb 12, 2024§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration storage enclosure created with metal gate installed under stairway soffit at public hall stairs, 1st story, section at northNov sent out
Nov 20, 2023§ 27-2005 adm code & 309 m/d law abate the nuisance consisting of missing vinyl floor tiles in the kitchen located at apt 4f, 4th story, 1st apartment from west at northCiv14 mailed
Nov 20, 2023§ 27-2005 hmc: properly repair or replace the broken or defective upper cabinet door hinges at south wall in the kitchen located at apt 4f, 4th story, 1st apartment from west at northCiv14 mailed
Apr 21, 2015Section 27-2005 adm code paint metal in accordance with dept. regulation the steam riser pipe in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west , section at northNov sent out
Apr 21, 2015Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west , section at northNov sent out
Apr 21, 2015Section 27-2026 adm code reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west , section at northNov sent out

Property Owners and Associates

Troy Industries, LLC
Corporate Owner
3.3(99)

63 Properties

3061 Units

Uplain LLC
Corporate Owner
2.8(1)

3 Properties

128 Units

Yechiel Weinberger
Site Manager, Agent, Head Officer
3.2(64)

56 Properties

2745 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

60% of renters recommend this building

60% of renters approve of this owner

Rents and Deposits

95% of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

Not bad compared to others
Former Tenant
Pros:
Cameras all around building. Clean (c) openiglo...
Cons:
Quite hard to get repairs (c) openigloo done in...
Advice to owner:
Honestly you property managers should live at l...