2186 Cruger Avenue,Bronx, NY 10462

73 Units

Built in 1930

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
175 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 99 violations which is 1.35 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
21Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
43Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
35Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Feb 28, 2024§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov certified on time
Feb 28, 2024§ 27-2041 adm code provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door missing in the entrance located at apt 2g, 3rd story, 1st apartment from south at westNov sent out
Feb 28, 2024§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov certified on time
Nov 17, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt lh, 1st story, 2nd apartment from south at west , section ''south''Nov sent out
Nov 17, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt lh, 1st story, 2nd apartment from south at west , section ''south''Nov sent out
Aug 22, 2023§ 27-2005 hmc: properly repair or replace the broken or defective door molding in the entrance located at apt 1h, 2nd story, 2nd apartment from south at west , section ''south''Nov sent out
Aug 22, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings, walls, doors and trim in the entire apartment located at apt 1h, 2nd story, 2nd apartment from south at west , section ''south''Nov sent out
Aug 10, 2023§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st storyNov sent out
Aug 10, 2023§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Aug 10, 2023§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Aug 10, 2023§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Jul 23, 2023§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st storyNov sent out
Jul 21, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation at riser in the bathroom located at apt la, 1st story, 2nd apartment from north at eastNov sent out
Jun 11, 2023Section 27-2005 adm code paint metal in accordance with dept. regulation 5th story bacony at building south at fire escape, 5th storyNov sent out
Jun 11, 2023Section 27-2005 adm code properly repair with similar material the broken or defective caulking around window frame at west wall in the 4th room from north at west located at apt 4d, 5th story, 2nd apartment from south at west , section ''north''Nov sent out
Jun 11, 2023Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling, all walls, all closets, and doors in the entire apartment located at apt 1h, 2nd story, 2nd apartment from south at west , section ''south''Nov sent out
Jun 11, 2023Section 27-2005 adm code replace with new the missing escutcheon plate at steam riser pipe at ceiling in the bathroom located at apt 1h, 2nd story, 2nd apartment from south at west , section ''south''Nov sent out
Jun 11, 2023Section 27-2005 adm code replace with new the missing escutcheon plate at steam riser pipe at ceiling in the kitchen located at apt 1h, 2nd story, 2nd apartment from south at west , section ''south''Nov sent out
Mar 01, 2022§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 1h, 2nd story, 2nd apartment from south at west , 1st section from east at southNot complied with
Jul 21, 2021§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNot complied with
Jul 21, 2021§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNot complied with

Property Owners and Associates

215 Parkville Condominium
Site Manager, Officer
0(0)

2 Properties

85 Units

2186 Cruger Avenue Apartment Corp.
Corporate Owner
0(0)

1 Property

73 Units

Abdullah Fersen
Site Manager, Officer
0(0)

2 Properties

85 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet