2022-04-05Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings and all walls in the entire apartment located at apt 5f, 5th story, 2nd apartment from south at westNov sent out
2022-04-05Section 27-2005 adm code properly repair the broken or defective bell and returned buzzer from vestibule to the panel in the entire apartment located at apt 5f, 5th story, 2nd apartment from south at westNov sent out
2016-03-24Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilng and all walls in the closet in the 1st room from north located at apt 3g, 2nd story, 3rd apartment from south at westNov sent out
2015-09-20Section 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hallNov sent out
2015-05-28Section 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at north wall. in the bathroom located at apt 6a, 6th story, 2nd apartment from east at southNot complied with
2014-06-27Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the bathroom located at apt 6e, 5th story, 1st apartment from south at westNov sent out