Jun 28, 2023§ 27-2027 admin. code: regrade with proper slope to existing drain the surface yardNov sent out
Jun 28, 2023§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st storyNov sent out
Jun 28, 2023§ 26-1103 admin. code: post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st storyNov sent out
Jun 28, 2023§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st storyNov sent out
Jun 28, 2023§ 27-2104 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st storyNov sent out
Feb 10, 2022Section 27-2005 admin. code: properly repair with similar material the broken or defective wood floor in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at eastNov sent out
Jan 28, 2022Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen located at apt 41, 1st story, 1st apartment from north at eastNov sent out
Jan 26, 2022Section 27-2005 admin. code: refit door in the entrance located at apt floor1, 1st story, 1st apartment from north at eastNov sent out
Jan 26, 2022Section 27-2005 admin. code: refit upper and lower window sash in the entire apartment located at apt floor1, 1st story, 1st apartment from north at eastNov sent out
Jan 26, 2022Section 27-2005 admin. code: properly repair with similar material the broken or defective rotted wood floor in the 1st room from east located at apt floor1, 1st story, 1st apartment from north at eastNov sent out
Jan 26, 2022Section 27-2026 admin. code: reset, so as to secure a proper and tight connection, the water closet bowl ... in the 1st bathroom from east at north located at apt floor1, 1st story, 1st apartment from north at eastNov sent out
Jan 26, 2022Section 27-2013 admin. code: paint with light colored paint to the satisfaction of this department at ceiling and walls in the entire apartment located at apt floor1, 1st story, 1st apartment from north at eastNov sent out