Sep 12, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st door from north at east wall, 1st riser from west at north wall in the bathroom located at apt 4g, 4th story, 1st apartment from south at westNov sent out
Sep 12, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the bathroom located at apt 4g, 4th story, 1st apartment from south at westNov sent out
Sep 08, 2023§ 27-2005 adm code properly repair with similar material the broken or defective regrout ceramic tiles at east and south walls in the bathroom located at apt 6c, 6th story, 1st apartment from north at eastNov sent out
Sep 08, 2023§ 27-2005 adm code properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 6c, 6th story, 1st apartment from north at eastNov sent out
Sep 08, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the bathroom located at apt 1a, 1st story, 1st apartment from south at westNov sent out
Sep 08, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1b, 1st story, 1st apartment from west at northNov sent out
Sep 08, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 1b, 1st story, 1st apartment from west at northNov sent out
Mar 17, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Dec 02, 2021§ 27-2005 adm code refit the door in the entrance located at apt 1g, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Dec 02, 2021§ 27-2005 adm code properly repair with similar material the broken or defective grout at marble floor saddle in the bathroom located at apt 1g, 1st story, 1st apartment from south at westFirst no access to re- inspect violation
Nov 15, 2018§ 27-2005 adm code paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 6f, 6th story, 3rd apartment from east at southNot complied with
Dec 03, 2017§ 27-2005 adm code paint metal in accordance with dept. regulation steam riser in the bathroom located at apt 1a, 1st story, 1st apartment from south at westNot complied with
Dec 03, 2017§ 27-2005 adm code paint metal in accordance with dept. regulation radiator in the kitchenette located at apt 1a, 1st story, 1st apartment from south at westNot complied with