3230 Cruger Avenue,Bronx, NY 10467

79 Units

Built in 1930

6 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
388 complaints
See all complaints about this building in a rental report

Open Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 137 violations which is 1.73 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
30Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
65Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
42Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Apr 02, 2024(a) § hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Feb 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at south located at apt 6m, 6th story, 3rd apartment from north at eastNov sent out
Feb 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 6m, 6th story, 3rd apartment from north at eastNov sent out
Feb 09, 2024§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the foyer located at apt 6m, 6th story, 3rd apartment from north at eastNov sent out
Dec 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department 1st door frame from east at south wall in the foyer located at apt 1j, 1st story, 1st apartment from south at westCiv14 mailed
Nov 29, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... remove 6 sq. ft. at ceiling, west wall and south wall in the bathroom located at apt 2l, 2nd story, 2nd apartment from north at eastCiv14 mailed
Oct 27, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door from north at east wall, 1st window frame from east at south wall in the 3rd room from north at west located at apt 1e, 1st story, 1st apartment from south at west , section at northCiv14 mailed
Oct 05, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 6b, 6th story, 1st apartment from north at eastNov sent out
Oct 01, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling inside closet in the private hallway located at apt 6b, 6th story, 1st apartment from north at east , section ''north''Nov sent out
Aug 10, 2023§ 27-2005 adm code properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 6b, 6th story, 1st apartment from north at eastNov sent out
Jul 11, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings and all walls in the entire apartment located at apt 4k, 4th story, 2nd apartment from east at south , 1st section from east at southNot complied with
Jul 11, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 4k, 4th story, 2nd apartment from east at south , 1st section from east at southNot complied with
Mar 16, 2023(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd's website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jun 14, 2022Section 27-2005 adm code paint metal in accordance with dept. regulation steam riser in the bathroom located at apt 3l, 3rd story, 4th apartment from north at eastNov sent out
Mar 04, 2022Section 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt apt2f, 2nd story, 3rd apartment from south at west , section ''north''Nov sent out
Mar 04, 2022Section 27-2013 adm code paint with light colored paint to the satisfaction of this department at south wall in the bathroom located at apt apt2f, 2nd story, 3rd apartment from south at west , section ''north''Nov sent out
Feb 17, 2022(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Dec 17, 2021§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and walls in the entire apartment located at apt 1d, 1st story, 1st apartment from east at southNot complied with
Sep 24, 2021Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the north and west walls in the 4th room from east located at apt 4c, 4th story, 2nd apartment from west at north , section at southwestNov sent out
Sep 24, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceilings, walls, doors and trim in the entire apartment located at apt 4c, 4th story, 2nd apartment from west at north , section at southwestNov sent out
Apr 02, 2021(a) � hmc:file annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpd?s website, www.nyc.gov\hpd, search bed bugs.Nov sent out
Jul 04, 2020Section 27-2005 adm code properly repair with similar material the broken or defective bathtub or reglaze porclaine enamel finish in the bathroom located at apt 5l, 5th story, 2nd apartment from north at east , section at southNot complied with
Dec 23, 2019Section 27-2011 adm code cleanse to the satisfaction of this department the mold at grout around tub in the bathroom located at apt 5l, 5th story, 2nd apartment from north at east , section ''south''Not complied with
Oct 17, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom , the 2nd room from east, the 1st room from east at south, the foyer located at apt 6a, 6th story, 2nd apartment from north at eastFirst no access to re- inspect violation
Jul 13, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from east located at apt 6a, 6th story, 2nd apartment from north at east , section ''north''First no access to re- inspect violation
Jul 13, 2018§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 6a, 6th story, 2nd apartment from north at east , section ''north''First no access to re- inspect violation
Jul 13, 2018§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt 6a, 6th story, 2nd apartment from north at east , section ''north''First no access to re- inspect violation
Jul 13, 2018§ 27-2013 adm code paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from east at south located at apt 6a, 6th story, 2nd apartment from north at east , section ''north''First no access to re- inspect violation
Dec 23, 2015§ 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at north and west walls in the bathroom located at apt 6g, 6th story, 2nd apartment from south at west , section at northFirst no access to re- inspect violation
Oct 27, 2015§ 27-2005 adm code properly repair with similar material the broken or defective ceramic wall tiles at water closet in the bathroom located at apt 6g, 6th story, 4th apartment from south at westFirst no access to re- inspect violation

Property Owners and Associates

323o'cruger Owners Corp
Corporate Owner
2.2(2)

2 Properties

135 Units

Alan Feurman
Site Manager
0(0)

1 Property

79 Units

Cruger O Management LLC
Agent
0(0)

1 Property

79 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet