Apr 04, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... on ceiling approx. 6 sq ft., east wall approximately 3 sq ft, north wall approximately 6 sq ft and west wall approximately 12 sq ft at vestibule , 1st storyNov sent out
Apr 04, 2024§ 27-2005 admin. code: properly repair with similar material the broken or defective fire retardant ceiling and all walls at vestibule , 1st storyNov sent out
Apr 04, 2024§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department the ceiling and all the walls at vestibule , 1st storyNov sent out
Apr 02, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 4-sq ft at ceiling and 3-sq ft at west wall at public hall, 1st storyNov sent out
Nov 18, 2023§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department at west wall, east wall,ceiling and north wall at public hall, 1st storyNov sent out
May 04, 2017Section 27-2023 admin. code: provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material. at garageNov sent out