654 East 224 Street,

Bronx, NY 10466

47 Units

Built in 1929

5 Floors

No reviews yet
lock
Once you submit an anonymous review for this building (or any other) you will gain access to the entire openigloo platform
Hey smart renter!
In the past three years, this building had:
1000 complaints
See all 311 complaints about this building in a rental report

Violations

A violation is issued to a building when a city inspector from NYC's Department of Housing Preservation and Development validates and confirms a complaint made to 311. The violations listed below are open violations that have yet to be addressed or have not been confirmed as resolved by the city.
This building has a total of 127 violations which is 2.7 violations per unit for their entire portfolio.
That is worse than the city average, which is 0.81 violations per unit.
Non-hazardous
23Class A
Non-Hazardous violations (i.e. no peephole on a door, or no street # on the building)
Learn More
Hazardous
58Class B
Hazardous violations (i.e. smoke detector issues, inadequate lighting)
Learn More
Immediately-hazardous
46Class C
Immediately Hazardous (i.e. rodents, inadequate heat or hot water)
Learn More
Approval DateDescriptionCurrent Status
Sep 21, 2023§ 27-2048 adm code paint or post a sign indicating floors missing at public hall, 2nd story, section at westNov sent out
Aug 04, 2023§ 27-2005 hmc: refit door in the 1st room from east at south located at apt a1, 2nd story, 1st apartment from east at south , section at eastCiv14 mailed
Aug 04, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls, ceiling, door frames and window frames in the entire apartment located at apt a1, 2nd story, 1st apartment from east at south , section at eastCiv14 mailed
Aug 04, 2023§ 27-2005 hmc: refit door in the entrance located at apt 3h, 3rd story, 1st apartment from west at northCiv14 mailed
Aug 04, 2023§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... approximately 2 sq ft at ceiling in the bathroom located at apt a1, 2nd story, 1st apartment from east at south , section at eastViolation will be reinspected
Aug 03, 2023§ 27-2005 hmc: refit door in the entrance located at apt 1e, 1st story, 2nd apartment from west at northCiv14 mailed
Aug 03, 2023§ 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt d, 1st story, 2nd apartment from west at northCiv14 mailed
Aug 03, 2023§ 27-2005 hmc: properly repair or replace the broken or defective sash lock at first window from west in the 1st room from north at west located at apt d, 1st story, 2nd apartment from west at northCiv14 mailed
Jul 28, 2023§ 27-2005 hmc: properly repair or replace the broken or defective marble saddle at door in the bathroom located at apt 1k, 2nd story, 1st apartment from north at east , 1st section from south at westCiv14 mailed
Jul 28, 2023§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 1k, 2nd story, 1st apartment from north at east , 1st section from south at westCiv14 mailed
Jul 28, 2023§ 27-2005 adm code properly repair with similar material the broken or defective bathtub or reglaze porcelain enamel finish in the bathroom located at apt 1k, 2nd story, 1st apartment from north at east , 1st section from south at westCiv14 mailed
Jul 28, 2023§ 27-2010, 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the extended roof ,over vestibule at front areaway, 2nd storyNov certified on time
Jul 28, 2023§ 27-2005 adm code replace with new the missing cover plate over electric outlet on south wall in the kitchen located at apt 1k, 2nd story, 1st apartment from north at east , 1st section from south at westCiv14 mailed
Jul 18, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 4th room from north, the 1st room from north, the bathroom , the foyer located at apt 1j, 2nd story, 2nd apartment from west at north , section ''654'', 1st from south at westCiv14 mailed
May 30, 2023§ 27-2013 adm code paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt d, 1st story, 1st apartment from north at eastCiv14 mailed
Aug 21, 2021Section 27-2013 adm code paint with light colored paint to the satisfaction of this department the ceiling and all walls in the bathroom located at apt 4g, 4th story, 2nd apartment from east at south , section at westNov sent out
Nov 18, 2020Section 27-2005 adm code properly repair the broken or defective cabinet at all walls in the kitchenette located at apt j, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Nov 13, 2020Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchenette located at apt j, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Nov 13, 2020Section 27-2005 adm code paint metal in accordance with dept. regulation riser in the bathroom located at apt j, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Aug 25, 2020Section 27-2013 adm code paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the foyer , the kitchen , the bathroom located at apt 1h, 1st story, 1st apartment from west at northFirst no access to re- inspect violation
Jul 28, 2019Section 27-2005 adm code paint metal in accordance with dept. regulation the riser in the bathroom located at apt j, 1st story, 1st apartment from north at eastFirst no access to re- inspect violation
Mar 31, 2019Section 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color north wall, behind the radiator in the 1st room from north located at apt 4g, 5th story, 2nd apartment from east at southNot complied with
Jan 10, 2018Section 27-2005 adm code refit the north window frame lower sash in the 1st room from north located at apt 4c, 5th story, 1st apartment from south at westFirst no access to re- inspect violation

Property Owners and Associates

233 Sita LLC
Corporate Owner
3.1(10)

23 Properties

703 Units

Devendra Singh
Shareholder, Officer
0(0)

4 Properties

112 Units

Devendra Singh
Shareholder
0(0)

2 Properties

96 Units

Frequently Asked Questions

Renter Q&A

ask-question
Be the first to ask a question!

Building Ratings

Water Pressure
1 () to 5 ()
Cleanliness
1 () to 5 ()
Pest Control
1 () to 5 ()
Heat
1 () to 5 ()
Noise Levels
1 () to 5 ()
Owner Responsiveness
1 () to 5 ()
Neighbors
1 () to 5 ()
Garbage Management
1 () to 5 ()
Water Pressure
Cleanliness
Pest Control
Heat
Noise Levels
Owner Responsiveness
Neighbors
Garbage Management

Renter Recommendations

--% of renters recommend this building

--% of renters approve of this owner

Rents and Deposits

-- of renters received their security deposits back
It HAS NOT been reported if this building accepts electronic rent payments.

Reviews

No reviews yet