Dec 20, 2021§ 27-2005 admin. code: refit apartment entrance door located at apt 1, 1st story, 1st apartment from east at southNov sent out
Nov 22, 2021§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from east, the foyer located at apt 1, 1st story, 1st apartment from east at southNov sent out
Nov 04, 2020§ 27-2005 admin. code: properly repair the broken or defective ceiling light fixture in the bathroom located at apt 1stfl, 1st story, 1st apartment from east at southNov sent out
Sep 25, 2020§ 27-2005 adm code properly repair the broken or defective electric light switch on south wall in the foyer located at apt 1, 1st story, 1st apartment from east at southNov sent out
May 27, 2020§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department ceiling and all walls in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Apr 28, 2020§ 27-2005 adm code paint metal in accordance with dept. regulation riser in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Apr 03, 2020§ 27-2005 adm code paint metal in accordance with dept. regulation steam riser in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Feb 29, 2020§ 27-2005 admin. code: properly repair with similar material the broken or defective bathtub or reglaze porlaine surface. in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Feb 29, 2020§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling and walls in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Feb 29, 2020§ 27-2005 admin. code: properly repair with similar material the broken or defective marble saddle at entrance door in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Feb 29, 2020§ 27-2005 admin. code: properly secure the loose washbasin in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Feb 29, 2020§ 27-2005 admin. code: properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Feb 29, 2020§ 27-2005 admin. code: replace with new the broken or defective base cabinet under washbasin in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Feb 24, 2020§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department at ceiling and walls in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Feb 19, 2020§ 27-2013 adm code paint with light colored paint to the satisfaction of this department at ceiling and west wall in the bathroom located at apt 1, 1st story, 1st apartment from east at southNov sent out
Dec 11, 2019§ 27-2026 adm code repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 1, 1st story, 1st apartment from north at eastNov sent out
Dec 09, 2019§ 27-2013 admin. code: paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1stflo, 1st story, 1st apartment from east at southNov sent out
Dec 09, 2019§ 27-2005 admin. code: refit window, upper and lower sash in the 6th room from east located at apt 1stflo, 1st story, 1st apartment from east at southNov sent out