Mar 21, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak the ceiling in the kitchen located at apt 2h, 2nd story, 2nd apartment from north at east , section ''north''Civ14 mailed
Feb 25, 2024§ 27-2026, 2027 hmc: properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4d, 5th story, 1st apartment from south at west , section ''south''Civ14 mailed
Feb 25, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... ceiling 1sq ft east wall 1sq ft and south wall 1sq ft in the bathroom located at apt 5b, 6th story, 1st apartment from east at south , section ''south''Notice of issuance sent to tenant
Jan 18, 2024§ 27-2017.3 hmc: trace and repair the source and abate the visible mold condition... east wall approx. 5 sq ft in the bathroom located at apt 4a, 4th story, 1st apartment from north at east , section ''south''Notice of issuance sent to tenant
Jan 26, 2023§ 27-2005 adm code replace with new the broken or defective ceramic floor tiles in the bathroom located at apt 4f, 4th story, 2nd apartment from south at west , section at northFirst no access to re- inspect violation
Jan 26, 2023§ 27-2005 adm code replace with new the missing ceramic tiles at west wall in the bathroom located at apt 4f, 4th story, 2nd apartment from south at west , section at northFirst no access to re- inspect violation
Jan 25, 2023§ 27-2005 adm code paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 4f, 4th story, 2nd apartment from south at west , section at northFalse certification